Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD02-01099
StatusFinaled
Name IVERSON CONSTRUCTION
Site Address 4174 E HOMESTEAD RIM DR
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a three bedroom, two bathroom 1502 sq. ft. single story single family dwelling with a attached 722 sq. ft. three car garage and a 162 sq. ft. covered front porch. Per approved plans and requirement list. This is a solar protected lot. CUP00-79 per Angie Thomas with Planning and Zoning. PC#258 (SAM)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/12/20029/12/20029/12/2002PPASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 09/12/2002 at 08:05:20. Contact: ###-####. C. of C. #22426 issued. 9/12/2002 3:53:08 PM
BLD-Final9/10/20029/11/20029/11/2002PFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 09/10/2002 at 12:04:46. Contact: ###-####. C/N on site 9/11/2002 4:52:31 PM
BLD-Energy code compliance7/15/20027/17/20027/17/2002APASS
DetailsSteven Webb
###-####- pete Ok to cover 7/17/2002 11:15:22 AM
BLD-Framing/Rough-in7/15/20027/16/20027/16/2002APASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 07/15/2002 at 16:13:36. Contact: ###-####. Ok to insulate. 7/16/2002 9:47:00 AM
BLD-Framing/Rough-in7/12/20027/15/20027/15/2002PPART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 07/12/2002 at 16:29:38. Contact: ###-####. SHEAR--Ok to side ext. Sop Work lifted. No framing--no approved plans on site. 7/15/2002 2:25:09 PM
BLD-Other7/11/20027/12/20027/12/2002AFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 07/11/2002 at 16:32:59. Contact: ###-####. C/N--Shear-- 7/12/2002 10:36:13 AM
BLD-Framing/Rough-in7/10/20027/11/20027/11/2002AFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 07/10/2002 at 10:28:19. Contact: ###-####. House is already sided-no shear inspection performed. No approved plans on site. Issued stop work--to remove siding at holdowns and to provide approved plans--call for re-inspection. 7/11/2002 9:11:30 AM
BLD-Foundation6/6/20026/7/20026/7/2002APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 06/06/2002 at 16:51:26. Contact: ###-####.interior pads and porch ft not ready or placed. 6/7/2002 11:48:37 AM
BLD-Footing6/6/20026/6/20026/6/2002PPART
DetailsSteven Webb
###-#### dane