BLD-Final | 9/6/2002 | 9/9/2002 | 9/9/2002 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/06/2002 at 10:49:02. Contact: ###-####.
|
BLD-Final | 9/5/2002 | 9/6/2002 | 9/6/2002 | P | CANC |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 09/05/2002 at 14:20:20. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 09/06/2002 at 10:47:31.
|
BLD-Final | 9/4/2002 | 9/5/2002 | 9/5/2002 | P | CANC |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 09/04/2002 at 13:46:59. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 09/05/2002 at 11:18:30.
|
BLD-Wall cover | 7/12/2002 | 7/15/2002 | 7/15/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 07/12/2002 at 14:51:37. Contact: ###-####. Ok to cover. 7/15/2002 3:25:07 PM
|
BLD-Framing/Rough-in | 7/11/2002 | 7/12/2002 | 7/12/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 07/11/2002 at 13:07:02. Contact: ###-####. C/N--Ok to insulate. 7/12/2002 4:10:23 PM
|
BLD-Other | 6/27/2002 | 6/27/2002 | 6/27/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/27/2002 at 09:51:54. Contact: ###-####. Shear--Ok to side--retrofitted hd needed at garage front left by framing inspection. 6/27/2002 1:37:26 PM
|
BLD-Framing/Rough-in | 6/25/2002 | 6/26/2002 | 6/26/2002 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/25/2002 at 14:42:39. Contact: ###-####. Shear--C/N posted--Do not side. 6/26/2002 11:57:40 AM
|
BLD-Foundation | 6/7/2002 | 6/10/2002 | 6/10/2002 | A | PART |
Steven Webb
|
|
|
###-#### chuck wip 6/10/2002 11:59:14 AM
|
BLD-Footing | 6/7/2002 | 6/7/2002 | 6/7/2002 | P | PART |
Dave Hannah
|
|
|
###-#### chuck called plz talked with Dan A about approved set backs all ok grade looks high 6/7/2002 1:45:05 PM
|
BLD-Footing | 6/5/2002 | 6/6/2002 | 6/6/2002 | A | CANC |
Steven Webb
|
|
|
###-#### chuck
|