BLD-Final | 10/28/2002 | 10/28/2002 | 10/28/2002 | P | PASS |
Russ Owen
|
|
|
TROY ###-#### FINAL FOR OCC
|
BLD-Framing/Rough-in | 8/21/2002 | 8/22/2002 | 8/22/2002 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 8/20/2002 | 8/21/2002 | 8/21/2002 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/20/2002 at 09:29:20. Contact: ###-####.
|
BLD-Framing/Rough-in | 8/21/2002 | 8/21/2002 | 8/21/2002 | A | FAIL |
Russ Owen
|
|
|
eed truss company repair detail for rear trusses in left 8/21/2002 3:38:54 PMrea bedroom , Insulation is ok I have talked with George S and we will approve this insulations as per the manufactures reccommendations for vapor barrier. 8/21/2002 3:40:05 PM
|
BLD-Framing/Rough-in | 8/15/2002 | 8/19/2002 | 8/19/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/15/2002 at 13:46:17. Contact: ###-####.c/n posted. 8/19/2002 11:06:00 AM
|
BLD-Wall cover | 8/14/2002 | 8/14/2002 | 8/14/2002 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/14/2002 at 09:02:44. Contact: ###-####.ok now had to have framer complete c/n at this time warned of re-inspection fee next time work is not complete. 8/14/2002 3:13:30 PM
|
BLD-Wall cover | 8/9/2002 | 8/12/2002 | 8/12/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/09/2002 at 08:48:18. Contact: ###-####.c/n posted. 8/12/2002 11:05:48 AM
|
BLD-Wall cover | 7/1/2002 | 7/2/2002 | 7/2/2002 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/01/2002 at 10:37:12. Contact: ###-####.
|
BLD-Foundation | 6/24/2002 | 6/25/2002 | 6/25/2002 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/24/2002 at 12:49:04. Contact: ###-####. WIP OK 6/25/2002 9:37:41 AM
|
BLD-Footing | 6/21/2002 | 6/24/2002 | 6/24/2002 | A | PART |
Jim Sly
|
|
|
###-#### BOB
|