BLD-Final | 2/4/2003 | 2/5/2003 | 2/5/2003 | P | CANC |
Steven Webb
|
|
|
###-#### CHIP All trades not done--notified builder--cancelled building until trades have been done. 2/5/2003 1:29:08 PM
|
BLD-Energy code compliance | 7/30/2002 | 7/30/2002 | 7/30/2002 | P | PASS |
Tony Young
|
|
|
###-#### DON
|
BLD-Framing/Rough-in | 7/26/2002 | 7/26/2002 | 7/26/2002 | P | PART |
Tony Young
|
|
|
fr don ###-####
ok to insulate,,, verify seal package 7/26/2002 3:57:22 PM
|
BLD-Framing/Rough-in | 7/23/2002 | 7/24/2002 | 7/24/2002 | A | PART |
Dave Hannah
|
|
|
shear nailing ###-#### ok to cover ext but still needs to install three hold downs 7/24/2002 9:04:14 AM
|
BLD-Framing/Rough-in | 7/24/2002 | 7/24/2002 | 7/24/2002 | P | NR |
Tony Young
|
|
|
; Phone #: ###-####
|
BLD-Framing/Rough-in | 7/22/2002 | 7/23/2002 | 7/23/2002 | P | FAIL |
Tony Young
|
|
|
###-####
c/n posted 7/23/2002 3:47:34 PM
|
BLD-Foundation | 6/20/2002 | 6/21/2002 | 6/21/2002 | A | PART |
Tony Young
|
|
|
DON ###-####
|
BLD-Footing | 6/19/2002 | 6/20/2002 | 6/20/2002 | P | PART |
Tony Young
|
|
|
###-#### DON
|