BLD-Aging Inspection | 2/27/2004 | 2/27/2004 | 2/27/2004 | | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 9/23/2002 | 9/24/2002 | 9/24/2002 | A | PASS |
Jim Storey
|
|
|
###-#### ###-#### tony young to recieve final avadavid from mti on concrete and strucal welding. final ok 9/24/2002 9:05:35 AM
|
FIRE-Final Inspection | 9/23/2002 | 9/23/2002 | 9/23/2002 | P | PASS |
Rick Jackson
|
|
|
|
BLD-Final | 8/28/2002 | 8/28/2002 | 8/28/2002 | P | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/28/2002 at 09:04:50. Contact: ###-####.need trades 1st, guardrail per code, conf. on final 8/28/2002 2:20:57 PM
|
FIRE-Final Inspection | 8/28/2002 | 8/28/2002 | 8/28/2002 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 08/28/2002 at 09:03:11. Contact: ###-####. door hardware not installed; need pull station at new exit door; emblems in guardrail not installed; screws sticking up in floor on floor by right hand exit door in hallway 8/28/2002 3:55:02 PM
|
BLD-Footing | 8/12/2002 | 8/12/2002 | 8/12/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/12/2002 at 06:38:21. Contact: ###-####. 7- Pier pads around steel columns-not footings. Rebar in place. 8/12/2002 12:07:47 PM
|
BLD-Footing | 8/8/2002 | 8/9/2002 | 8/9/2002 | A | DONE |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/08/2002 at 09:32:09. Contact: ###-####. Concrete already poured--inspected by MTI-special inspection--verified (7) 3' X 3' pads with #5 rebar. 8/9/2002 11:27:35 AM
|
BLD-Footing | 7/18/2002 | 7/18/2002 | 7/18/2002 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/18/2002 at 10:47:52. Contact: ###-####.
rebar in retaining walls for ramp,, wip 7/18/2002 2:57:35 PM
|
BLD-Footing | 7/15/2002 | 7/16/2002 | 7/16/2002 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/15/2002 at 12:52:08. Contact: ###-####.
S. I. ON SITE,, PENDING REPORT 7/16/2002 12:30:26 PM
|