BLD-Final | 11/27/2002 | 11/27/2002 | 11/27/2002 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Amy Lawson c.c # 22608 issued 11/27/2002 1:24:49 PM
|
BLD-Final | 11/26/2002 | 11/26/2002 | 11/26/2002 | P | FAIL |
Dave Hannah
|
|
|
rj smith; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie c/n on site insulate rim in crawel and outlet boxes on ext walls 11/26/2002 2:47:45 PM
|
BLD-Framing/Rough-in | 10/14/2002 | 10/14/2002 | 10/14/2002 | P | PART |
Steven Webb
|
|
|
Phone #: ###-#### Internet Inspection Request from: Amy Lawson C/N posted --detached garage--Ok to insulate. 10/14/2002 2:24:09 PM
|
BLD-Energy code compliance | 10/10/2002 | 10/11/2002 | 10/11/2002 | A | FAIL |
Steven Webb
|
|
|
rj smith; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Framing on detached garage not energy--C/n posted upstairs--detached garage window. 10/11/2002 10:17:59 AM
|
BLD-Energy code compliance | 10/3/2002 | 10/4/2002 | 10/4/2002 | A | PART |
Steven Webb
|
|
|
###-#### Ok to cover--HOUSE ONLY not detached garage. 10/4/2002 10:05:29 AM
|
BLD-Conference | 9/30/2002 | 10/2/2002 | 10/2/2002 | A | DONE |
Steven Webb
|
|
|
rjsmith; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 9/19/2002 | 9/19/2002 | 9/19/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 09/19/2002 at 09:46:15. Contact: ###-####. C/N posted--ok to insulate house and attached garage only. 9/19/2002 2:24:54 PM
|
BLD-Framing/Rough-in | 9/12/2002 | 9/13/2002 | 9/13/2002 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 09/12/2002 at 15:50:31. Contact: ###-####. C/N posted-do not insulate. 9/13/2002 10:59:06 AM
|
BLD-Framing/Rough-in | 9/12/2002 | 9/12/2002 | 9/12/2002 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 09/12/2002 at 08:11:28. Contact: ###-####. need a complete set of plans on site city approved 9/12/2002 2:41:35 PM
|
BLD-Wall cover | 8/26/2002 | 8/26/2002 | 8/26/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/26/2002 at 08:30:22. Contact: ###-####. Detached garage and house OSB wall ok for shear--Check rear of attached garage for OSB shear at framing.-- ok to cover exterior. 8/26/2002 1:40:42 PM
|
BLD-Wall cover | 8/22/2002 | 8/22/2002 | 8/22/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/22/2002 at 09:02:04. Contact: ###-####. SHEAR--Ext. of house ok; detached garage light on staples (failed) interior OSB wall needs blocked and nails--check at frame. Interior stairs to upper section--top section under 36" in width. 8/22/2002 3:40:54 PM
|
BLD-Wall cover | 8/13/2002 | 8/13/2002 | 8/13/2002 | P | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/13/2002 at 07:41:08. Contact: ###-####. SHEAR--C/N posted and telephoned builder--Full inspection needed--no roof on structure at time of inspection--hd covered by OSB, no access to 2nd floor, not ready--missing hd at interior--roof stucture and re-call. 8/13/2002 4:44:12 PM
|
BLD-Foundation | 7/1/2002 | 7/2/2002 | 7/2/2002 | A | PART |
Dave Hannah
|
|
|
found james ###-#### work 95 % every thing ok crew still needs to set straps 7/2/2002 9:33:02 AM
|
BLD-Foundation | 7/1/2002 | 7/2/2002 | 7/2/2002 | A | CANC |
Steven Webb
|
|
|
found james ###-####
|
BLD-Footing | 7/1/2002 | 7/1/2002 | 7/1/2002 | P | PART |
Steven Webb
|
|
|
JAMES ###-#### wip--80% ready 7/1/2002 2:52:12 PM
|