BLD-Final | 1/20/2003 | 1/21/2003 | 1/21/2003 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 1/20/2003 at 10:50:39 AM. Contact: ###-####.
|
BLD-Final | 1/10/2003 | 1/13/2003 | 1/13/2003 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/10/2003 at 15:54:37. Contact: ###-####. fire stopping / garage water supply gyp requred at wall/ supply ducts insulated to sub floor/ paint off fire door lable. 1/13/2003 9:06:30 AM
|
BLD-Energy code compliance | 9/27/2002 | 9/27/2002 | 9/27/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 09/27/2002 at 10:28:18. Contact: ###-####. Ok to cover--VERIFY POST UP UNDER CUT OUT I-JOIST (UNDER KITCHEN) AT FINAL. 9/27/2002 2:22:39 PM
|
BLD-Framing/Rough-in | 9/25/2002 | 9/26/2002 | 9/26/2002 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 09/25/2002 at 15:54:09. Contact: ###-####. C/N--Ok to insulate 9/26/2002 10:55:51 AM
|
BLD-Framing/Rough-in | 9/10/2002 | 9/10/2002 | 9/10/2002 | P | PART |
Tom Arcoraci
|
|
|
shear willam ###-#### ok to side 9/10/2002 2:46:01 PM
|
BLD-Foundation | 7/1/2002 | 7/1/2002 | 7/1/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/01/2002 at 06:39:39. Contact: ###-####.appears ok 1 horizontal in all walls. 7/1/2002 10:52:33 AM
|
BLD-Footing | 6/28/2002 | 6/28/2002 | 6/28/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/28/2002 at 08:01:03. Contact: ###-####.
|