BLD-Final | 2/13/2003 | 2/14/2003 | 2/14/2003 | P | PASS |
Dave Hannah
|
|
|
jason ###-#### c.c # 22632 issued 2/14/2003 9:20:31 AM
|
BLD-Final | 2/11/2003 | 2/12/2003 | 2/12/2003 | P | NR |
Dave Hannah
|
|
|
###-#### jason
|
BLD-Framing/Rough-in | 11/12/2002 | 11/13/2002 | 11/13/2002 | P | PASS |
Dave Hannah
|
|
|
shear ###-#### clyde all c/n items completed ok to cover 11/13/2002 1:15:14 PM
|
BLD-Energy code compliance | 11/12/2002 | 11/12/2002 | 11/12/2002 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 11/8/2002 | 11/12/2002 | 11/12/2002 | A | PART |
Dave Hannah
|
|
|
shear -###-####- clize
|
BLD-Framing/Rough-in | 11/4/2002 | 11/4/2002 | 11/4/2002 | A | PASS |
Jim Storey
|
|
|
engineering ok framing c/n's made ok/ ok to insulate and osb sheer interior 2 nd floor.
|
BLD-Framing/Rough-in | 10/16/2002 | 10/17/2002 | 10/17/2002 | A | FAIL |
Jim Storey
|
|
|
###-#### ###-####called and no resopnce to have conf. on site. 10/17/2002 12:16:17 PM ment strucral engineer on site and will get joist used and lay out drawings as well as engineers dirctions to resolve loading at cantalever two locations. 10/17/2002 4:56:00 PM
|
BLD-Framing/Rough-in | 10/8/2002 | 10/9/2002 | 10/9/2002 | P | FAIL |
Steven Webb
|
|
|
###-#### C/N posted--Do not insulate--to many items need correcting. Correct and comply with correction notice and re-call. 10/9/2002 2:43:03 PM
|
BLD-Framing/Rough-in | 10/7/2002 | 10/8/2002 | 10/8/2002 | A | FAIL |
Dave Hannah
|
|
|
###-#### no truss engineering and seal package not installed no inpection done told framer to get these itms done and reschdule 10/8/2002 11:11:46 AM
|
BLD-Framing/Rough-in | 9/16/2002 | 9/17/2002 | 9/17/2002 | A | PART |
Steven Webb
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung SHEAR--C/N posted--ok to side ext. 9/17/2002 8:51:38 AM
|
BLD-Framing/Rough-in | 9/12/2002 | 9/12/2002 | 9/12/2002 | P | FAIL |
Steven Webb
|
|
|
jason; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung SHEAR-Eng. calls for 1" penetration in framing through siding already installed on nailing pattern per approved plans--not done. Recall after nailing/staples are complete. 9/12/2002 2:40:58 PM
|
BLD-Framing/Rough-in | 9/9/2002 | 9/10/2002 | 9/10/2002 | P | FAIL |
Jim Storey
|
|
|
JASON ###-#### work not done per engineering/ siding in place nailling that is exposed overdriven or not in place.!!! 9/10/2002 10:58:51 AM
|
BLD-Framing/Rough-in | 8/21/2002 | 8/21/2002 | 8/21/2002 | P | FAIL |
Steven Webb
|
|
|
Phone #: ###-#### SHEAR--C/N--Still not a complete approved set of plans on site-$42.00 re-inspection fee-no further inspections until paid. No complete inspection performed on shear to date. 8/21/2002 1:51:37 PM
|
BLD-Framing/Rough-in | 8/19/2002 | 8/20/2002 | 8/20/2002 | A | FAIL |
Steven Webb
|
|
|
JASON; Phone #: ###-#### C/N--SHEAR-Received engineering per first c/n. Shear panels not nailed per plans & missing blocks at misc. locations. Requested builder to provide complete set of approved plans. 8/20/2002 12:12:42 PM
|
BLD-Framing/Rough-in | 8/15/2002 | 8/16/2002 | 8/16/2002 | A | FAIL |
Steven Webb
|
|
|
CGEORGE; Phone #: ###-#### C/N--Areas already sided--provide eng. to determine if nails can be surfaced nailed through siding. Areas not sided do not comply with approved plans--Recall 8/16/2002 10:33:04 AM
|
BLD-Foundation | 7/2/2002 | 7/3/2002 | 7/3/2002 | A | PART |
Dave Hannah
|
|
|
found-- mike ###-#### rebar is tied forms about 20% 7/3/2002 11:19:58 AM
|
BLD-Footing | 7/2/2002 | 7/2/2002 | 7/2/2002 | P | PART |
Dave Hannah
|
|
|
ft mike ###-#### work in progress setbacks ok ground ok 7/2/2002 1:50:46 PM
|