Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD02-01450
StatusFinaled
Name OGATA CONSTRUCTION
Site Address 4283 N MARCLIFFE AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the addition of a 143s.f. sunroom addition to an existing single family dwelling. R-1C setbacks ok per akt. All per the approved plans as marked . pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/10/200210/10/200210/10/2002PPASS
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD-Framing/Rough-in8/9/20028/12/20028/12/2002APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 08/09/2002 at 13:21:04. Contact: ###-####.
BLD-Framing/Rough-in7/31/20027/31/20027/31/2002PFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 07/31/2002 at 09:31:58. Contact: ###-####.c/n on site 7/31/2002 4:44:48 PM
BLD-Other7/29/20027/29/20027/29/2002PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/29/2002 at 10:11:25. Contact: ###-####.ok to side there are some hold downs installed at the rear, which are not called out on the plans. Note these plans lack details, as there is nothing more than a floor plan, but have been approved by our office. 7/29/2002 2:56:30 PM 7/29/2002 2:58:56 PM
BLD-Footing7/12/20027/12/20027/12/2002PFAIL
DetailsRuss Owen
###-####. Posted a c/n on job card , to provide 24 In depth at entire footing, as per approved plans. Also told this to concrete contractor at the site. Note: concrete truck is at the site now , If I was here 15 min later it would have been poured. Also note very poor plans. Just a typical wall elevation hand out from Boise City which does not pertain to construction at the job site. But has been approved by the plan reveiwer. 7/12/2002 4:10:18 PM
BLD-Footing7/12/20027/12/20027/12/2002PFAIL
DetailsRuss Owen
###-####. Posted a c/n on job card , to provide 24 In depth at entire footing, as per approved plans. Also told this to concrete contractor at the site. Note: concrete truck is at the site now , If I was here 15 min later it would have been poured. Also note very poor plans. Just a typical wall elevation hand out from Boise City which does not pertain to construction at the job site. But has been approved by the plan reveiwer. 7/12/2002 4:10:18 PM