BLD-Final | 9/24/2002 | 9/24/2002 | 9/24/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/24/2002 at 07:09:41. Contact: ###-####. SchedCuled by a contractor via Hello! on 09/24/2002 at 07:09:41. Contact: ###-####. 9/24/2002 9:56:02 AM C/C issued. 9/24/2002 9:56:33 AM
|
BLD-Final | 9/18/2002 | 9/18/2002 | 9/18/2002 | P | CANC |
Jim Sly
|
|
|
JOHN; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie-CANCEL PER JOHN
|
BLD-Energy code compliance | 8/1/2002 | 8/1/2002 | 8/1/2002 | P | PASS |
Russ Owen
|
|
|
; Phone #: ###-####
|
BLD-Framing/Rough-in | 7/31/2002 | 7/31/2002 | 7/31/2002 | P | FAIL |
Jim Sly
|
|
|
dave ; Phone #: ###-#### C/N 7/31/2002 3:16:44 PM
|
BLD-Foundation | 7/10/2002 | 7/10/2002 | 7/10/2002 | P | PART |
Russ Owen
|
|
|
RYAN ###-####wip. 7/10/2002 4:41:25 PM
|
BLD-Footing | 7/9/2002 | 7/9/2002 | 7/9/2002 | P | PART |
Dave Hannah
|
|
|
DAVE ###-#### checked setbacks all look ok forms about 65% 7/9/2002 2:27:18 PM
|