BLD-Final | 7/5/2002 | 7/5/2002 | 7/5/2002 | P | PART |
Dave Hannah
|
|
|
JOHN ###-####
|
BLD-Final | 7/3/2002 | 7/3/2002 | 7/3/2002 | P | FAIL |
Jim Sly
|
|
|
JOHN ###-#### NR...Need Electr, load hinges, complete step, nail rock....verbal. 7/4/2002 2:12:10 AM
|
BLD-Framing/Rough-in | 6/20/2002 | 6/20/2002 | 6/20/2002 | P | PASS |
Dave Hannah
|
|
|
###-#### JOHN ok to cover after elec c/n items are signed off 6/20/2002 3:16:28 PM
|
BLD-Framing/Rough-in | 6/19/2002 | 6/19/2002 | 6/19/2002 | P | PART |
Dave Hannah
|
|
|
john ###-#### fr needs elec r/i ok to insulate after elec oks needs to finish framing on window 6/19/2002 1:46:24 PM
|