BLD-Final | 9/10/2002 | 9/11/2002 | 9/11/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 09/10/2002 at 11:49:58. Contact: ###-####.
|
BLD-Final | 9/5/2002 | 9/6/2002 | 9/6/2002 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 09/05/2002 at 13:05:53. Contact: ###-####. still needs elec final on inspection done at this time 9/6/2002 2:00:41 PM
|
BLD-Framing/Rough-in | 7/18/2002 | 7/19/2002 | 7/19/2002 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/18/2002 at 21:08:10. Contact: ###-####.
|
BLD-Framing/Rough-in | 7/16/2002 | 7/17/2002 | 7/17/2002 | P | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/16/2002 at 13:59:38. Contact: ###-####.need trades,, no insp. 7/17/2002 3:18:31 PM
|