BLD-Final | 7/31/2002 | 8/1/2002 | 8/1/2002 | A | PASS |
Russ Owen
|
|
|
###-#### or ###-#### terry
|
BLD-Framing/Rough-in | 7/15/2002 | 7/16/2002 | 7/16/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/15/2002 at 15:16:01. Contact: ###-####.front post ok. only rest not ready. 7/16/2002 2:46:36 PM
|
BLD-Footing | 7/3/2002 | 7/3/2002 | 7/3/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/03/2002 at 07:05:51. Contact: ###-####.Reviewed plans for the lateral anaylisis. footing requirements for the front doors has been written ,and is unclear does not make any since, I called the engineer and he told me what he wanted and I told him this was unusual for a pole barn next time detail this to avoid any complications , as now the holes have to be dug deeper and a second inspection will be required. Also not plan check does not ask for enogh detail. 7/3/2002 10:29:54 AM
|
BLD-Footing | 7/3/2002 | 7/3/2002 | 7/3/2002 | P | PASS |
Russ Owen
|
|
|
front footings are now 5 foot deep, Niticed contractor framing girts flat plans call for girts on edge, as per engineering. Or have engineer ok as built. 7/3/2002 4:07:03 PM
|
BLD-Footing | 7/1/2002 | 7/2/2002 | 7/2/2002 | P | PART |
Russ Owen
|
|
|
JIM ###-#### , appears ok no plans at site. 7/2/2002 5:04:28 PM
|