Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD02-01603
StatusFinaled
Name SHILOH DEVELOPMENT LTD CO
Site Address 3853 E PECAN ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a four bedroom, three bathroom 2688 sq. ft. two story single family dwelling (1390 sq. ft. first floor/1298 sq. ft. second floor) with a attached 898 sq. ft. three car garage, a 130 sq. ft. deck off the second floor, a 260 sq. ft. covered back porch and a 147 sq. ft. covered front porch. Per approved plans, engineering and requirement list. This is a solar and shade restricted lot. PC#396 (SAM)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/14/20031/14/20031/14/2003PPASS
DetailsJim Storey
troy ###-####
BLD-Energy code compliance11/6/200211/7/200211/7/2002APASS
DetailsTom Arcoraci
###-#### ok to cover 11/7/2002 10:25:03 AM
BLD-Energy code compliance11/4/200211/6/200211/6/2002PCANC
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Rita DeYoungvia contractor 11/6/2002 3:49:26 PM
BLD-Framing/Rough-in11/1/200211/4/200211/4/2002ANR
DetailsSteven Webb
Scheduled by a contractor via Hello! on 11/01/2002 at 11:52:18. Contact: ###-####. C/N--Need air seal package prior to framing inspection. 11/4/2002 9:34:18 AM
BLD-Framing/Rough-in11/4/200211/4/200211/4/2002PPART
DetailsSteven Webb
troy ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie C/N posted-Ok to insulate. 11/4/2002 2:12:59 PM
BLD-Final11/1/200211/4/200211/1/2002ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/01/2002 at 11:50:02. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 11/01/2002 at 11:53:28.
BLD-Framing/Rough-in10/23/200210/24/200210/24/2002APART
DetailsTom Arcoraci
###-#### ok to side 10/24/2002 10:59:57 AM
BLD-Framing/Rough-in10/22/200210/23/200210/23/2002AFAIL
DetailsSteven Webb
###-#### randyy C/N posted--Staples have excessive penetration in shear panels. Re-staple and re-call. 10/23/2002 9:27:58 AM
BLD-Foundation9/24/20029/24/20029/24/2002PPART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 09/24/2002 at 06:31:21. Contact: ###-####. wip--90% ready--rebar in place--hd not installed at time of inspection. 9/24/2002 2:56:47 PM
BLD-Footing9/23/20029/23/20029/23/2002PPART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 09/23/2002 at 07:55:28. Contact: ###-####. wip--setbacks ok--check rear of garage at rear column to see if changes were made from approved plans--if so--eng. is needed--contractor wanted to reduce column from 22" to 12". 9/23/2002 1:37:57 PM