Permanent Occupancy | | 5/21/2003 | 5/21/2003 | | DONE |
|
|
|
|
BLD-Final | 9/12/2002 | 9/12/2002 | 9/12/2002 | P | PART |
Jim Storey
|
|
|
###-#### ###-####all but exterior work complet temp occ ok. 9/12/2002 3:31:14 PM
|
FIRE-Final Inspection | 9/12/2002 | 9/12/2002 | 9/12/2002 | P | PASS |
Troy Cobbley
|
|
|
fire life/safety and fire alarm OK 9/12/2002 12:56:53 PM
|
BLD-Final | 9/4/2002 | 9/5/2002 | 9/5/2002 | A | PART |
Jim Storey
|
|
|
###-#### ###-####temp occ use of kitchen areas ok with fire dept agreement. 9/5/2002 3:13:35 PM
|
BLD-Framing/Rough-in | 9/5/2002 | 9/5/2002 | 9/5/2002 | P | PASS |
Jim Storey
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Darla Downs ceilling ok for cover. 9/5/2002 3:13:57 PM
|
BLD-Final | 9/3/2002 | 9/4/2002 | 9/4/2002 | A | NR |
Jim Storey
|
|
|
TEMP OCC; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
FIRE-Final Inspection | 8/30/2002 | 9/3/2002 | 9/3/2002 | A | PART |
Troy Cobbley
|
|
|
temporary occupancy given, Items to be corrected include but are not limited to providing manual pull stations at all exits in the remodeled areas, provide smoke detectors in sleeping and recreation areas, and the inspection report does not include visual annunciation, and the system may be required to be upgraded to meet code at a future date 9/4/2002 7:22:31 AM
|
Code Occupancy Approval Temp | | | 9/3/2002 | | PART |
|
|
|
According to Sara, the DR has been modified to eliminate the landscaping. The landscaping will be dealt with when modifications are made to the play area and will be included in the new DR. Therefore, temp occupancy is approved pending completion of the interior construction.
|
BLD-Final | 8/30/2002 | 8/30/2002 | 8/30/2002 | P | FAIL |
Tom Arcoraci
|
|
|
partial for temp ###-#### needs ok from fire for temp 8/30/2002 1:48:22 PM
|
Code Occupancy Approval Temp | 8/30/2002 | 8/30/2002 | 8/30/2002 | P | DONE |
Scott M.Brown
|
|
|
PLAY AREA AND FENCES, WALKWAY NOT COMPLETED AS REQUIRED UNDER DRH02-00091, NEEDS TO BOND FOR TOTAL $5,500.00 THEN WE CAN SIGNE TEMP. 8/30/2002 2:14:39 PM
|
BLD-Other | 8/21/2002 | 8/22/2002 | 8/22/2002 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/21/2002 at 17:41:40. Contact: ###-####.need mech for type2 duct with occ protcction. 8/22/2002 1:10:37 PM
|
BLD-Footing | 8/19/2002 | 8/19/2002 | 8/19/2002 | P | PASS |
Jim Storey
|
|
|
BRIAN; Phone #: ###-####ft per engineering on site. ok 8/19/2002 3:14:15 PM
|
BLD-Footing | 8/6/2002 | 8/7/2002 | 8/7/2002 | A | FAIL |
Jim Storey
|
|
|
###-#### ###-####arch and engineer to adress strucral roof support and how 1 hr occupance is to be achived. roof system not as per archived plan. 8/7/2002 12:19:17 PM
|