BLD-Final | 1/23/2003 | 1/23/2003 | 1/23/2003 | P | PART |
Russ Owen
|
|
|
gail; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie corrections made . Just need final approval for fire sprinklers , then would be ok for a permanent oc. 1/23/2003 1:42:44 PM
|
FIRE-Final Inspection | 1/23/2003 | 1/23/2003 | 1/23/2003 | P | PASS |
Troy Cobbley
|
|
|
fire alarm finaled
|
Permanent Occupancy | | 1/23/2003 | 1/23/2003 | | DONE |
|
|
|
|
BLD-Final | 1/7/2003 | 1/8/2003 | 1/8/2003 | A | FAIL |
Tony Young
|
|
|
call gayle first ###-####
need to complete demising wall per plan, trade sign off, final letter of satisfaction on epoxy bolting, c/n posted 1/8/2003 9:52:40 AM
|
FIRE-Final Inspection | 1/7/2003 | 1/7/2003 | 1/7/2003 | P | PART |
Troy Cobbley
|
|
|
Fire life safety has been given a temporary occupancy until the fire alarm drawings have been approved and an inspection for the fire alarm system has taken place or verify a recent annual inspection. This is with Dave Millers permission on 1-7-03
|
BLD-Other | 12/4/2002 | 12/4/2002 | 12/4/2002 | A | DONE |
Troy Cobbley
|
|
|
Fire alarm work has been performed without a fire alarm permit. I notified sam rogers and the fire alarm contractor.
|
BLD-Final | 10/3/2002 | 10/4/2002 | 10/4/2002 | A | CANC |
Russ Owen
|
|
|
gale call first ; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
FIRE-Final Inspection | 10/3/2002 | 10/3/2002 | 10/3/2002 | P | FAIL |
Troy Cobbley
|
|
|
submitt sprinkler drawings as per the fire dept plan review comments for the possible high pile storage and the rack sprinklers 10/3/2002 3:54:43 PM
|
BLD-Framing/Rough-in | 8/8/2002 | 8/8/2002 | 8/8/2002 | P | PART |
Russ Owen
|
|
|
MIKE ; Phone #: ###-####ok pending electrical. 8/8/2002 4:51:56 PM
|