BLD-Final | 11/12/2002 | 11/13/2002 | 11/13/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/12/2002 at 09:24:07. Contact: ###-####.
|
BLD-Energy code compliance | 9/25/2002 | 9/27/2002 | 9/27/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 09/25/2002 at 07:27:16. Contact: ###-####.
|
BLD-Framing/Rough-in | 9/20/2002 | 9/23/2002 | 9/23/2002 | P | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 09/20/2002 at 08:29:09. Contact: ###-####.
|
BLD-Framing/Rough-in | 9/5/2002 | 9/5/2002 | 9/5/2002 | A | PART |
Dave Hannah
|
|
|
shear ok to cover ext check retro fit hold down on south side of front window at frame 9/5/2002 11:10:33 AM
|
BLD-Framing/Rough-in | 9/3/2002 | 9/3/2002 | 9/3/2002 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 09/03/2002 at 08:27:39. Contact: ###-####.back and front ok needs to renail side and retro fit one strape that falls under front window 9/3/2002 4:01:16 PM
|
BLD-Framing/Rough-in | 8/22/2002 | 8/22/2002 | 8/22/2002 | P | PART |
Dave Hannah
|
|
|
alan; Phone #: ###-#### one hr fire walls ok tostand 8/22/2002 3:05:10 PM
|