BLD-Final | 11/17/2002 | 11/18/2002 | 11/18/2002 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/17/2002 at 22:14:53. Contact: ###-####. C/N -- Handrail in garage required to return into wall. All prior c/n items corrected. 11/18/2002 8:20:08 AM
|
BLD-Final | 11/18/2002 | 11/18/2002 | 11/18/2002 | P | PASS |
Jim Storey
|
|
|
###-#### ###-#### c/n made ok for returns in garge handrail. 11/18/2002 3:21:18 PM
|
BLD-Final | 11/15/2002 | 11/15/2002 | 11/15/2002 | P | FAIL |
Jim Storey
|
|
|
###-#### ###-#### no access to bldg. 2nd time reinsp. fee due before requsting a insp. 11/15/2002 9:06:57 AM
|
BLD-Final | 11/13/2002 | 11/14/2002 | 11/14/2002 | A | FAIL |
Jim Storey
|
|
|
fn p j ###-#### fn provide c/n from previous final insp. 11/13/2002 3:17:06 PM no access 11/14/2002 9:19:27 AM
|
BLD-Final | 10/29/2002 | 10/30/2002 | 10/30/2002 | A | FAIL |
Steven Webb
|
|
|
P J ###-#### C/N on site. 10/30/2002 10:11:30 AM
|
BLD-Framing/Rough-in | 9/25/2002 | 9/25/2002 | 9/25/2002 | P | CANC |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 09/25/2002 at 07:53:21. Contact: ###-####. shear wall inspection Frame already passed 9/25/2002 1:11:34 PM
|
BLD-Energy code compliance | 8/26/2002 | 8/26/2002 | 8/26/2002 | A | NR |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/26/2002 at 06:36:55. Contact: ###-####.
|
BLD-Energy code compliance | 8/26/2002 | 8/26/2002 | 8/26/2002 | P | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Framing/Rough-in | 8/26/2002 | 8/26/2002 | 8/26/2002 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 8/25/2002 | 8/26/2002 | 8/26/2002 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/25/2002 at 19:12:54. Contact: ###-####. C/N--ok to insulate 8/26/2002 10:55:07 AM
|
BLD-Framing/Rough-in | 8/22/2002 | 8/23/2002 | 8/23/2002 | A | PART |
Steven Webb
|
|
|
Phone #: ###-#### C/N--Ok to insulate. 8/23/2002 10:58:10 AM
|
BLD-Framing/Rough-in | 8/14/2002 | 8/14/2002 | 8/14/2002 | P | PART |
Steven Webb
|
|
|
###-#### SHEAR--Eng. provide on fireplace at rear and front of garage blocked and nailed. Ok to side ext. NOTE: At framing---Check rear of garage foundational wall-2 X 4 wall on concrete needs to be 16" o.c. not 24" o.c. 8/14/2002 2:49:37 PM
|
BLD-Framing/Rough-in | 8/12/2002 | 8/13/2002 | 8/13/2002 | A | NR |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/12/2002 at 17:39:10. Contact: ###-####. shear wall
|
BLD-Framing/Rough-in | 8/12/2002 | 8/13/2002 | 8/13/2002 | A | NR |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/12/2002 at 17:39:10. Contact: ###-####. Need all trade r.i prior to framing. 8/13/2002 9:07:39 AM
|
BLD-Wall cover | 8/12/2002 | 8/13/2002 | 8/13/2002 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/12/2002 at 17:38:28. Contact: ###-####. SHEAR--C/N posted on garage front--ok to side except garage front and rear where circled in black on approved plans. 8/13/2002 9:08:33 AM
|
BLD-Foundation | 7/29/2002 | 7/29/2002 | 7/29/2002 | P | DONE |
Steven Webb
|
|
|
###-#### jim
|
BLD-Foundation | 7/29/2002 | 7/29/2002 | 7/29/2002 | A | PART |
Steven Webb
|
|
|
wip--95% ready-no hd installed at time of inspections. 7/29/2002 11:41:43 AM
|
BLD-Footing | 7/25/2002 | 7/25/2002 | 7/25/2002 | P | PART |
Steven Webb
|
|
|
jim; Phone #: ###-#### wip--50% ready 7/25/2002 3:57:50 PM
|