BLD-Final | 9/12/2003 | 9/12/2003 | 9/12/2003 | P | PASS |
Tony Young
|
|
|
|
BLD-Grading Inspection | 9/12/2003 | 9/12/2003 | 9/12/2003 | | BND |
Rita DeYoung
|
|
|
Grading and drainage complete and approved. However, revegetation and approval for backfill behind the upper retaining wall has not been completed. Upon receipt of $3500.00 bond recommended by the engineer the grading and drainage is conditionally approved.
|
FIRE-Final Inspection | 9/12/2003 | 9/12/2003 | 9/12/2003 | P | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 9/12/2003 at 7:52:38 AM. Contact: ###-####. fire not required for sign off 9/12/2003 11:52:35 AM
|
BLD-Final | 9/11/2003 | 9/11/2003 | 9/11/2003 | P | FAIL |
Tony Young
|
|
|
please call first ###-#### travis
c/n posted 9/11/2003 4:33:41 PM
|
BLD-Final | 8/13/2003 | 8/14/2003 | 8/14/2003 | A | CANC |
Tony Young
|
|
|
weston; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Final | 8/7/2003 | 8/8/2003 | 8/8/2003 | A | FAIL |
Tony Young
|
|
|
TRAVIS; Phone #: ###-#### Internet Inspection Request from: Linda Hartwell
no inspection will be made untill Terry Records signs off on hillside ord. 8/8/2003 11:52:29 AM
|
BLD-Footing | 4/4/2003 | 4/7/2003 | 4/7/2003 | A | PART |
Tony Young
|
|
|
###-####
ftg for retaining wall, ok pending engineer approval 4/7/2003 9:37:34 AM
|
BLD-Footing | 4/2/2003 | 4/3/2003 | 4/3/2003 | P | FAIL |
Tony Young
|
|
|
clint; Phone #: ###-#### Internet Inspection Request from: Annette Moore
need soil and structural eng. to look at and provide letter of approval as built 4/3/2003 3:51:56 PM
|
BLD-Energy code compliance | 12/16/2002 | 12/16/2002 | 12/16/2002 | P | PASS |
Steven Webb
|
|
|
travis; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 12/16/2002 | 12/16/2002 | 12/16/2002 | P | PASS |
Steven Webb
|
|
|
travis; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 12/11/2002 | 12/12/2002 | 12/12/2002 | A | PART |
Tony Young
|
|
|
###-####
c/n posted, ok to insulate 12/12/2002 1:00:00 PM
|
BLD-Framing/Rough-in | 12/12/2002 | 12/12/2002 | 12/12/2002 | P | CANC |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 12/9/2002 | 12/10/2002 | 12/10/2002 | P | FAIL |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: Amy Lawsonneed trades 1st 12/12/2002 9:54:24 AM
|
BLD-Framing/Rough-in | 12/6/2002 | 12/9/2002 | 12/9/2002 | A | PART |
Tony Young
|
|
|
###-#### travis
ext shear ok 12/10/2002 1:27:43 PM
|
BLD-Framing/Rough-in | 10/29/2002 | 10/30/2002 | 10/30/2002 | A | CANC |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 10/30/2002 | 10/30/2002 | 10/30/2002 | P | FAIL |
Tony Young
|
|
|
c/n posted 10/30/2002 3:47:53 PM
|
BLD-Final | 10/24/2002 | 10/24/2002 | 10/24/2002 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Foundation | 9/4/2002 | 9/4/2002 | 9/4/2002 | P | PART |
Tony Young
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
wip 9/4/2002 3:02:39 PM
|
BLD-Footing | 8/29/2002 | 8/29/2002 | 8/29/2002 | P | PART |
Tony Young
|
|
|
as late as possible; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung,,, wip 8/30/2002 8:12:15 AM
|
BLD-Grading Inspection | 8/27/2002 | 8/27/2002 | 8/27/2002 | | DONE |
Rita DeYoung
|
|
|
FOOTING SUBGRADE HAS BEEN APPROVED BY THE GEOTECHNICAL ENGINEER
|
BLD-Conference | 2/6/2004 | 2/6/2004 | | P | |
Tony Young
|
|
|
Ok Tony this is it...
|