BLD-Final | 10/25/2002 | 10/25/2002 | 10/25/2002 | P | PASS |
Steven Webb
|
|
|
code is 2222 on gar key code-- ###-#### dave c. of c. #22444 10/25/2002 12:34:18 PM
|
BLD-Final | 10/24/2002 | 10/24/2002 | 10/24/2002 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/24/2002 at 06:46:21. Contact: ###-####. cn posted 10/24/2002 10:35:14 AM
|
BLD-Final | 10/24/2002 | 10/24/2002 | 10/24/2002 | P | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/24/2002 at 10:51:16. Contact: ###-####. no one at house for access no answer on phone 10/24/2002 3:20:17 PM
|
BLD-Energy code compliance | 8/29/2002 | 8/29/2002 | 8/29/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/29/2002 at 06:51:02. Contact: ###-####. Frame OK. 8/29/2002 11:47:39 AM
|
BLD-Framing/Rough-in | 8/27/2002 | 8/27/2002 | 8/27/2002 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/27/2002 at 06:16:23. Contact: ###-####. C/N ok to insulate. 8/27/2002 11:27:20 AM
|
BLD-Wall cover | 8/13/2002 | 8/13/2002 | 8/13/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/13/2002 at 07:23:23. Contact: ###-####. SHEAR--Ok to side exterior--Int gysum shear needed--rear of garage. 8/13/2002 1:40:15 PM
|
BLD-Foundation | 7/24/2002 | 7/24/2002 | 7/24/2002 | P | PART |
Steven Webb
|
|
|
mana ###-####
|
BLD-Footing | 7/23/2002 | 7/23/2002 | 7/23/2002 | P | PART |
Jim Sly
|
|
|
ft dave -###-####
|
BLD-Footing | 7/23/2002 | 7/23/2002 | 7/23/2002 | P | PART |
Steven Webb
|
|
|
ft dave -###-#### wip--35% ready--setbacks appear ok 7/23/2002 3:07:30 PM
|