BLD-Aging Inspection | 3/14/2005 | 3/14/2005 | 3/14/2005 | | PASS |
Jim Storey
|
|
|
final ok 3/14/2005 7:36:40 AM
|
BLD-Aging Inspection | 9/14/2004 | 9/14/2004 | 9/14/2004 | | PART |
Jim Storey
|
|
|
waiting for others to sign off. 9/20/2004 8:11:33 AM
|
BLD-Aging Inspection | 7/12/2004 | 7/12/2004 | 7/12/2004 | | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 5/10/2004 | 5/10/2004 | 5/10/2004 | | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 3/9/2004 | 3/9/2004 | 3/9/2004 | | PASS |
Jim Storey
|
|
|
wip 3/9/2004 8:34:54 AM
|
BLD-Aging Inspection | 1/5/2004 | 1/5/2004 | 1/5/2004 | | PART |
Jim Storey
|
|
|
wip 1/5/2004 8:27:43 AM
|
BLD-Aging Inspection | 10/21/2003 | 10/21/2003 | 10/21/2003 | | PASS |
Jim Storey
|
|
|
wip 10/21/2003 8:08:27 AM
|
BLD-Aging Inspection | 8/18/2003 | 8/18/2003 | 8/18/2003 | | PART |
Jim Storey
|
|
|
wip small section to be com pleted at next phase of project. 8/18/2003 8:57:47 AM
|
BLD-Final | 6/6/2003 | 6/9/2003 | 6/9/2003 | A | PART |
Jim Storey
|
|
|
###-#### ###-#### fire door test passed with plan aproved convor sys. 6/9/2003 4:58:26 PM belt product approved by plan review. 6/9/2003 4:58:54 PM
|
FIRE-Final Inspection | 6/6/2003 | 6/9/2003 | 6/9/2003 | A | PASS |
Rick Jackson
|
|
|
###-####
|
BLD-Final | 6/2/2003 | 6/4/2003 | 6/4/2003 | A | FAIL |
Jim Storey
|
|
|
DAVE; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
FIRE-Final Inspection | 6/2/2003 | 6/4/2003 | 6/4/2003 | A | FAIL |
Rick Jackson
|
|
|
DAVE--PENDING FN INSP; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie baggage not passing completely through the fire shutter as designed 6/4/2003 1:06:36 PM
|
BLD-Aging Inspection | 4/18/2003 | 4/18/2003 | 4/18/2003 | | PART |
Jim Storey
|
|
|
wip 4/18/2003 8:46:58 AM
|
BLD-Framing/Rough-in | 1/15/2003 | 1/16/2003 | 1/16/2003 | A | PART |
Jim Storey
|
|
|
###-#### ###-#### requsted listing of fire shuders to clear up aplacation on or in gyp. wall all approved plans reflect massonary or concrete.1/16/2003 12:09:50 PM 1/16/2003 12:11:25 PM
|
FIRE-Conference | 1/9/2003 | 1/10/2003 | 1/10/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 01/09/2003 at 13:39:54. Contact: ###-####. checked first fire door where it passes through area separation wall; fusible link to deck and at 2nd floor fusible link cuts through sheetrock; will need plate to prevent obstructing release of the cable 1/10/2003 10:12:39 AM
|
BLD-Framing/Rough-in | 11/20/2002 | 11/21/2002 | 11/21/2002 | A | PART |
Jim Storey
|
|
|
glenn-fire wall; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie west fire shutter at check in area instalation is as per approved plan 28 to go. 11/21/2002 10:56:50 AM
|
FIRE-Final Inspection | 11/20/2002 | 11/21/2002 | 11/21/2002 | A | PART |
Rick Jackson
|
|
|
glenn-fire wall; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie not a final inspection - met with contractor for the fire door construction where the conveyor passes through rated walls/floors. installed per plans but will have to meet testing for fire fly and baggage optical eye operation 11/21/2002 1:00:14 PM
|
BLD-Framing/Rough-in | 10/22/2002 | 10/23/2002 | 10/23/2002 | A | PART |
Jim Storey
|
|
|
DAN; Phone #: ###-#### Internet Inspection Request from: Darla Downs strucral atchment of convaor sys. per listing and approved plan . work in progess a line. fire assemblies not in place at this time. 10/23/2002 9:54:58 AM
|