Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD02-01720
StatusFinaled
Name BEARMAKERZ
Site Address 350 N MILWAUKEE ST Unit: 2005
Project NameBTS - #2005
Customer Number 
ePlanReviewNo
Description
(BEARMAKERZ)(BOISE TOWNE SQUARE-SPACE 2005) To remodel a 3,474 sq.ft. retail tenant space located on the upper level per approved plans on file. Work to include, construction of a new storefront system, installation of new roll up security grill, construction of a one-hour corridor system, interior partitions, new raised floor area with a new accessible restroom, one new accessible unisex restroom, installation of suspended ceiling system, Miscelaneous related interior finishes, counters and cabinets. NOTE: This building is fully fire sprinklered and contains a smoke evacuation system, any alterations to the fire sprinkler system shall be per NFPA #13 as regulated by the fire deparment. The smoke evacuation system must remain operational as installed under the 1985 UBC. (pc448-02) rmh
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection5/2/20055/2/20055/2/2005 PASS
DetailsJim Storey
DOC - Permit Finaled5/2/20055/2/20055/2/2005PPASS
DetailsJim Storey
l/c isued downtown
BLD-Final12/11/200212/12/200212/12/2002APASS
DetailsRuss Owen
###-####. ok for perm oc. 12/12/2002 11:37:50 AM
FIRE-Final Inspection12/10/200212/11/200212/11/2002APASS
DetailsTroy Cobbley
ok for perm occupancy 12/11/2002 12:44:30 PM
FIRE-Final Inspection12/4/200212/5/200212/5/2002PCANC
DetailsTroy Cobbley
cancelled by Jim with Steed construction 12/5/2002 4:07:36 PM
FIRE-Final Inspection12/2/200212/2/200212/2/2002PFAIL
DetailsTroy Cobbley
smoke exhaust system does not operate correctly. The louver appears to be stuck 12/2/2002 4:27:37 PM
BLD-Final10/4/200210/4/200210/4/2002PPART
DetailsRuss Owen
ok temp oc , c/n handrail step riser. 10/4/2002 1:49:33 PM
FIRE-Final Inspection10/3/200210/4/200210/4/2002PCANC
DetailsRuss Owen
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
FIRE-Final Inspection10/3/200210/4/200210/4/2002APART
DetailsTroy Cobbley
temporary occupancy given on the fire life/safety and the fire alarm per dave miller's permission until the fire alarm drawings are approved and the system tested. the fire sprinklers are finaled and life/safety is finaled. I notified the contractor that hardware on several doors needed changed. He made the phone call to the supplyer while I was there. Structural inspector to please verify the change out 10/4/2002 8:53:48 AM
BLD-Framing/Rough-in9/26/20029/26/20029/26/2002PPART
DetailsRuss Owen
ceiling grid jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
FIRE-Conference9/23/20029/24/20029/24/2002ADONE
DetailsTroy Cobbley
spoke with the contractor about location of the new duct smoke detectors. 9/24/2002 9:32:54 AM
BLD-Framing/Rough-in9/18/20029/18/20029/18/2002PPART
DetailsRuss Owen
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD-Framing/Rough-in9/4/20029/5/20029/5/2002APART
DetailsCarl Dependahl
###-####; braces added at 24" oc, vertical member & redundant ceiling frame ok to delete. eng's letter to follow 9/5/2002 12:15:50 PM
BLD-Framing/Rough-in9/3/20029/4/20029/4/2002AFAIL
DetailsRuss Owen
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. entry framing not per plan. 9/4/2002 10:42:16 AM
BLD-Framing/Rough-in8/22/20028/22/20028/22/2002PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/22/2002 at 07:23:58. Contact: . framing ok. 8/23/2002 8:53:46 AM
BLD-Framing/Rough-in8/14/20028/14/20028/14/2002ACANC
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 08/14/2002 at 07:23:55. Contact: ###-####. recall. 8/14/2002 4:52:37 PM
BLD-Framing/Rough-in8/14/20028/14/20028/14/2002PPART
DetailsRuss Owen
JIM ###-#### floor only recall, needs bracing and insulaton 8/14/2002 1:44:05 PM