BLD-Final | 1/30/2003 | 1/31/2003 | 1/31/2003 | A | PART |
Steven Webb
|
|
|
got missed -from yesterday--wayne ###-#### C/N Need to complete air seal behind plates on outside walls and provide provisions to prevent soil erosion on exterior of house. Temp. c. of c. #23400 issued-good for 90 days from today. 1/31/2003 9:10:55 AM
|
BLD-Final | 1/29/2003 | 1/30/2003 | 1/30/2003 | A | NR |
Carl Dependahl
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung c/n, complete air seal, elec & f.p. finals, access hatch & patch at bsmt/crawl wall... 1/30/2003 10:55:23 AM
|
BLD-Final | 1/30/2003 | 1/30/2003 | 1/30/2003 | P | DONE |
Dave Hannah
|
|
|
###-####
|
BLD-Energy code compliance | 10/18/2002 | 10/18/2002 | 10/18/2002 | P | PASS |
Tom Arcoraci
|
|
|
###-#### bryan
|
BLD-Framing/Rough-in | 10/17/2002 | 10/17/2002 | 10/17/2002 | P | PASS |
Tom Arcoraci
|
|
|
###-#### BRYAN
|
BLD-Framing/Rough-in | 10/15/2002 | 10/16/2002 | 10/16/2002 | A | PART |
Jim Storey
|
|
|
BRIAN; Phone #: ###-#### Internet Inspection Request from: Darla Downs ele contractor tooh out criple at 2nd floor top plate support master bedroom/ nail floor joist to hanger in basement above shower. 10/16/2002 11:16:13 AM
|
BLD-Framing/Rough-in | 10/11/2002 | 10/14/2002 | 10/14/2002 | A | FAIL |
Steven Webb
|
|
|
Phone #: ###-#### Internet Inspection Request from: Amy Lawson No approved plans on site. 10/14/2002 11:14:07 AM
|
BLD-Framing/Rough-in | 9/24/2002 | 9/24/2002 | 9/24/2002 | P | PART |
Jim Storey
|
|
|
###-#### exterior ok 9/24/2002 2:39:02 PM
|
BLD-Foundation | 8/9/2002 | 8/9/2002 | 8/9/2002 | P | DONE |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/09/2002 at 06:41:38. Contact: ###-####. All walls outside basement--rebar and hd in place--no approved plans only early start -- pour at own risk. 8/9/2002 3:29:02 PM
|
BLD-Footing | 8/8/2002 | 8/8/2002 | 8/8/2002 | P | DONE |
Steven Webb
|
|
|
JIM; Phone #: ###-#### Footings for house and garage. No approved plans on site--verified rebar pinned to basement walls. Basement floor just poured-talked to flatwork contractor--no rebar on point loads were installed--contractor was starting to install prior to concrete setting up--pour at own risk. 8/8/2002 1:17:28 PM
|
BLD-Foundation | 7/31/2002 | 8/1/2002 | 8/1/2002 | A | DONE |
Steven Webb
|
|
|
###-#### RYAN No approved plans on site--basement walls only--#4 rebar @ 2' on center. Pour at own risk. 8/1/2002 9:54:41 AM
|
BLD-Footing | 7/26/2002 | 7/26/2002 | 7/26/2002 | P | PART |
Dave Hannah
|
|
|
jim ###-#### early start on ftg checked setbacks garage side and basement the rest of the ftgs not in 7/26/2002 2:23:00 PM
|