BLD-Final | 9/27/2002 | 9/30/2002 | 9/30/2002 | P | PASS |
Tony Young
|
|
|
fn call 1st before insp - brian -###-####
|
BLD-Final | 9/24/2002 | 9/24/2002 | 9/24/2002 | P | FAIL |
Jim Sly
|
|
|
fn brian- ###-#### C/N on site.....Part foot insp, no frame insp, verify bearing of roof (at house). 9/24/2002 2:30:46 PM
|
BLD-Footing | 8/20/2002 | 8/21/2002 | 8/21/2002 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/20/2002 at 18:07:34. Contact: ###-####.wip 8/21/2002 11:52:29 AM
|
BLD-Footing | 8/21/2002 | 8/21/2002 | 8/21/2002 | P | PART |
Tony Young
|
|
|
call first ###-#### 8/21/2002 11:11:49 AM
|