BLD-Aging Inspection | 3/24/2006 | 3/24/2006 | 3/24/2006 | | CANC |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 3/24/2006 | 3/24/2006 | 3/24/2006 | A | PASS |
Mike Jordan
|
|
|
All insp. were finaled by others as per history.
|
BLD-Final | 10/3/2002 | 10/4/2002 | 10/4/2002 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/03/2002 at 17:18:57. Contact: ###-####.ok perm oc. 10/4/2002 12:40:22 PM
|
BLD-Final | 10/1/2002 | 10/1/2002 | 10/1/2002 | A | FAIL |
Russ Owen
|
|
|
c/n posted also needs a mechanical permit no mec02-02487 finaled.10/1/2002 1:03:13 PM 10/1/2002 1:10:30 PM
|
BLD-Final | 9/27/2002 | 9/30/2002 | 9/30/2002 | P | PART |
Russ Owen
|
|
|
fn occ jack- ###-####c/n posted. 9/30/2002 5:05:01 PM
|
BLD-Final | 9/27/2002 | 9/27/2002 | 9/27/2002 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/27/2002 at 07:05:37. Contact: ###-####.. needs mec /fire/electrical prior to a final structural. 9/27/2002 3:29:23 PM
|
FIRE-Final Inspection | 9/27/2002 | 9/27/2002 | 9/27/2002 | P | PASS |
Troy Cobbley
|
|
|
fire life/safety finaled for the shell 9/27/2002 2:30:40 PM
|
BLD-Framing/Rough-in | 9/9/2002 | 9/10/2002 | 9/10/2002 | A | FAIL |
Russ Owen
|
|
|
c/n posted for 1 wall same as prior. 9/10/2002 12:45:58 PM
|
BLD-Wall cover | 9/9/2002 | 9/9/2002 | 9/9/2002 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/09/2002 at 10:07:25. Contact: ###-####. unable to do this day will schedual for am . 9/9/2002 5:03:18 PM
|
BLD-Framing/Rough-in | 8/27/2002 | 8/28/2002 | 8/28/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/27/2002 at 15:53:38. Contact: ###-####. need detail for slip joint contractor will get this . 8/28/2002 12:59:50 PM
|