BLD-Final | 12/19/2002 | 12/20/2002 | 12/20/2002 | P | PASS |
Dave Hannah
|
|
|
access thru garage - keyless entry code is 2580 enter.; Phone #: ###-#### Internet Inspection Request from: alan gossi cc issued 12/20/2002 2:52:50 PM
|
BLD-Wall cover | 10/18/2002 | 10/18/2002 | 10/18/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/18/2002 at 07:19:48. Contact: ###-####.
|
BLD-Energy code compliance | 10/15/2002 | 10/16/2002 | 10/16/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/15/2002 at 16:16:24. Contact: ###-####. need interior sheer. 10/16/2002 12:26:28 PM
|
BLD-Framing/Rough-in | 10/14/2002 | 10/14/2002 | 10/14/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/14/2002 at 10:25:01. Contact: ###-####. c/n items completed ok to insulate 10/14/2002 2:59:04 PM
|
BLD-Framing/Rough-in | 10/8/2002 | 10/8/2002 | 10/8/2002 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/08/2002 at 09:22:27. Contact: ###-####.sole plates not screwed with 4.5 inch 6 oc per plan / fire blk at stairs/ missing a35s per engineering/ missing drag strut and a 35s/ missing coil strap 2nfloor/ truss engineering not for this house at 22 ft span. 10/8/2002 3:46:53 PM
|
BLD-Wall cover | 9/25/2002 | 9/25/2002 | 9/25/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 09/25/2002 at 11:17:46. Contact: ###-####. SHEAR-OK TO SIDE. 9/25/2002 4:31:34 PM
|
BLD-Foundation | 8/29/2002 | 8/30/2002 | 8/30/2002 | A | PART |
Steven Webb
|
|
|
lesley; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie wip--75% ready; 8/30/2002 9:35:38 AM
|
BLD-Footing | 8/28/2002 | 8/28/2002 | 8/28/2002 | P | PART |
Steven Webb
|
|
|
wes; Phone #: ###-#### wip-reviewed hd requirements--20% ready. 8/28/2002 2:40:20 PM
|