Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD02-01865
StatusFinaled
Name SHEPHERDSON MARK D &
Site Address 2702 W PALOUSE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
tear off and recover with 30 yr architectual 36 squares $6500 aml
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/24/20031/24/20031/24/2003PPASS
DetailsTom Arcoraci
###-#### Mark Shepsardson
BLD-Final8/26/20028/26/20028/26/2002AFAIL
DetailsJim Storey
1. ATTIC VENTILATION - Enclosed attics and enclosed rafter spaces formed where ceilings are applied directly to the underside of roof rafters shall have cross ventilation for each separate space by ventilating openings protected against the entrance of rain and snow. The net free ventilating area shall not be less than 1/150 of the area of the space ventilated. The openings shall be covered with corrosion-resistant metal mesh with mesh openings of 1/4 inch in dimension. 1994 UBC 1505.3 See limited exceptions.