BLD-Conference | 10/29/2002 | 11/5/2002 | 11/5/2002 | A | PART |
Carl Dependahl
|
|
|
project previously finalled, ok for c/o 11/5/2002 1:56:22 PM 11/5/2002 1:56:59 PM
|
BLD-Final | 10/29/2002 | 10/30/2002 | 10/30/2002 | A | PASS |
Jim Storey
|
|
|
###-#### PETE
|
BLD-Conference | 10/29/2002 | 10/29/2002 | 10/29/2002 | P | PASS |
Carl Dependahl
|
|
|
fire ok 10/29/02 5:20:39 PM
|
BLD-Final | 10/25/2002 | 10/28/2002 | 10/28/2002 | A | NR |
Carl Dependahl
|
|
|
need to verify sprinkler sign off and prior c/n... 10/29/02 10:24:25 AM
|
BLD-Final | 10/25/2002 | 10/25/2002 | 10/25/2002 | P | CANC |
Tony Young
|
|
|
###-#### pete
appears that there is an open permit on sprinklers????? rescheduled for 340 on mon. morning 10/25/2002 2:51:51 PM
|
FIRE-Final Inspection | 10/17/2002 | 10/17/2002 | 10/17/2002 | P | PASS |
Rick Jackson
|
|
|
pete -###-####
|
BLD-Final | 10/14/2002 | 10/15/2002 | 10/15/2002 | P | PART |
Carl Dependahl
|
|
|
ok for t/o, complete spreader bars at new office as req'd 10/15/02 5:03:53 PM
|
BLD-Conference | 10/11/2002 | 10/14/2002 | 10/14/2002 | P | PASS |
Carl Dependahl
|
|
|
rec'd MTI's report...called Dave Cram...matches existing 10/14/02 4:22:56 PM
|
BLD-Final | 10/10/2002 | 10/11/2002 | 10/11/2002 | A | NR |
Carl Dependahl
|
|
|
Pete, need SI report 10/11/02 5:20:12 PM
|
BLD-Final | 10/10/2002 | 10/10/2002 | 10/10/2002 | P | NR |
Carl Dependahl
|
|
|
###-#### PETE need spec insp report (patch fire proofing) & verify hvac as ok. 10/10/02 4:17:49 PM
|
BLD-Framing/Rough-in | 10/7/2002 | 10/7/2002 | 10/7/2002 | P | NR |
Carl Dependahl
|
|
|
###-####...need spec ins 10/7/02 4:37:36 PM
|
BLD-Framing/Rough-in | 9/26/2002 | 9/26/2002 | 9/26/2002 | P | FAIL |
Carl Dependahl
|
|
|
###-####, c/n,grid &sprayed fireproofing scraped off at t.o.w. 9/26/2002 6:42:50 PM
|
BLD-Framing/Rough-in | 9/24/2002 | 9/24/2002 | 9/24/2002 | P | NR |
Carl Dependahl
|
|
|
keep correction, need all seismic wires; will check minor hvac w/ frame reinsp.
|
BLD-Conference | 9/23/2002 | 9/23/2002 | 9/23/2002 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/23/2002 at 08:41:18. Contact: ###-####...w/ builder & framer, need hvac permit & seismic for grid. 9/24/2002 2:10:47 PM
|
BLD-Framing/Rough-in | 9/23/2002 | 9/23/2002 | 9/23/2002 | P | FAIL |
Carl Dependahl
|
|
|
Phone #: ###-#### Internet Inspection Request from: Amy Lawson; need seismic bracing for grid & hvac permit/insp. 9/23/2002 2:54:42 PM
|
BLD-Framing/Rough-in | 9/17/2002 | 9/17/2002 | 9/17/2002 | P | PART |
Carl Dependahl
|
|
|
PETE; Phone #: ###-#### Internet Inspection Request from: Annette Moore
PLEASE CALL 1ST, elec R/I is passed, need hvac... 9/17/2002 2:25:23 PM
|
BLD-Framing/Rough-in | 9/12/2002 | 9/13/2002 | 9/13/2002 | A | NR |
Jim Storey
|
|
|
PETE; Phone #: ###-#### Internet Inspection Request from: Darla Downscalled pete left measage need ele/ no insp. performed. 9/16/2002 9:35:09 AM
|
BLD-Conference | 9/12/2002 | 9/12/2002 | 9/12/2002 | P | PASS |
Carl Dependahl
|
|
|
ok to 1 side walls
|