BLD-Final | 8/21/2003 | 8/22/2003 | 8/22/2003 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/21/2003 at 12:37:21 PM. Contact: ###-####. ok for lc 8/22/2003 10:23:38 AM
|
BLD-Final | 8/4/2003 | 8/6/2003 | 8/6/2003 | A | NR |
Carl Dependahl
|
|
|
###-#### eric....need plbg,htg finals 8/6/2003 11:25:01 AM
|
BLD-Conference | 1/29/2003 | 1/29/2003 | 1/29/2003 | P | PASS |
Carl Dependahl
|
|
|
w/ owner re comb air duct reqs. 1/29/2003 3:50:52 PM
|
BLD-Energy code compliance | 1/29/2003 | 1/29/2003 | 1/29/2003 | P | PART |
Carl Dependahl
|
|
|
addn ok
|
BLD-Framing/Rough-in | 1/28/2003 | 1/29/2003 | 1/29/2003 | A | PART |
Carl Dependahl
|
|
|
COMPLETE AIR SEAL INSP- ERIK; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...ok to cover exc. at bsmt "family rm"...need verify continuous comb air duct at lid( joist space was insulated) 1/29/2003 1:53:42 PM
|
BLD-Framing/Rough-in | 1/24/2003 | 1/24/2003 | 1/24/2003 | P | NR |
Steven Webb
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung Frame already passed--needed energy--insulation and seal package not completed--reviewed items with builder which needs completed--will complete and recall when ready. 1/24/2003 3:19:49 PM
|
BLD-Framing/Rough-in | 1/19/2003 | 1/21/2003 | 1/21/2003 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/19/2003 at 20:17:26. Contact: ###-####...ok to insulate, complete air seal . 1/21/2003 11:42:59 AM
|
BLD-Framing/Rough-in | 12/17/2002 | 12/17/2002 | 12/17/2002 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/17/2002 at 08:54:46. Contact: ###-####...shear ok, ( no hd's on plans!) stairs need to be even...wip, ok to continue 12/17/2002 4:23:45 PM
|
BLD-Framing/Rough-in | 12/12/2002 | 12/13/2002 | 12/13/2002 | P | NR |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 12/12/2002 at 21:35:26. Contact: ###-####. C/N posted--Need all trade sign offs plus for shear need all holdowns nailed with 16d nails, all shear panels blocked and nailed. 12/13/2002 2:20:55 PM
|
BLD-Conference | 10/28/2002 | 10/29/2002 | 10/29/2002 | A | PASS |
Carl Dependahl
|
|
|
w/ bldr re: block out sewer at fnd. 10/29/02 9:46:35 AM
|
BLD-Foundation | 10/28/2002 | 10/29/2002 | 10/29/2002 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/28/2002 at 16:57:08. Contact: ###-####.
|
BLD-Foundation | 10/29/2002 | 10/29/2002 | 10/29/2002 | A | PART |
Carl Dependahl
|
|
|
rebar tied to existing, ok; connect ufer to vert steel in ftg...consult electrician.
|
BLD-Conference | 10/25/2002 | 10/28/2002 | 10/28/2002 | A | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/25/2002 at 12:32:57. Contact: ###-####.
340 wanted to see? 10/28/2002 4:31:30 PM
|
BLD-Conference | 10/15/2002 | 10/16/2002 | 10/16/2002 | A | PASS |
Carl Dependahl
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung...dowel all verts into existing fnd wall & add horizontal bar at top...ok to continue. 10/16/02 11:22:34 AM
|
BLD-Footing | 10/14/2002 | 10/15/2002 | 10/15/2002 | P | PART |
Jim Sly
|
|
|
###-#### Advised Contr. to call for Conf. insp B 4 forming Bsmnt wall at existing Found.......Footing OK . 10/15/2002 2:47:45 PM 10/15/2002 2:49:33 PM
|