BLD-Footing | 9/17/2002 | 9/18/2002 | 9/18/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/17/2002 at 16:45:10. Contact: .
###-#### DALE FOR POOL . set backs ok noted to contractor 3 foot of area as noted on plot plan must be maintained to pool appron,also noted windows close to pool may be required to be replaced with temperd glass, unable to get accuraqte measurements at this time not yet complete. 9/18/2002 11:40:03 AM
|