BLD-Final | 4/24/2003 | 4/25/2003 | 4/25/2003 | P | PASS |
Russ Owen
|
|
|
###-####. ok perm oc. 4/25/2003 3:43:25 PM
|
FIRE-Final Inspection | 4/23/2003 | 4/25/2003 | 4/25/2003 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety is OK. Fire alarm and fire sprinklers finaled 4/25/2003 10:32:36 AM
|
Permanent Occupancy | | 4/25/2003 | 4/25/2003 | | DONE |
|
|
|
|
FIRE-Final Inspection | 4/22/2003 | 4/23/2003 | 4/23/2003 | P | FAIL |
Troy Cobbley
|
|
|
doug; Phone #: ###-#### Can not final the life safety until the fire sprinkler deficiencies have been taken care of. All life safety items are OK 4/23/2003 3:36:11 PM
|
Code Occupancy Approval | | | 4/10/2003 | | PASS |
|
|
|
ALL IN TO PLAN AS NOTED FINAL SIGNED OFF.
|
FIRE-Final Inspection | 4/7/2003 | 4/9/2003 | 4/9/2003 | A | FAIL |
Troy Cobbley
|
|
|
doug; Phone #: ###-#### I could not final the life safety due to the fire alarm permit still needing to be finaled. As far as life/safety signs need to be added at the fire dept. access gate and at the purge fan switch. Four roll down fire doors need to be tested. We tested one at the conveyor but it did not operate correctly. 4/9/2003 12:54:58 PM
|
BLD-Footing | 11/11/2002 | 11/12/2002 | 11/12/2002 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/11/2002 at 16:09:36. Contact: .unable to make as hoilday and short handed employee"s.. 11/12/2002 2:57:04 PM
|