BLD-Final | 1/9/2003 | 1/9/2003 | 1/9/2003 | P | PASS |
Jim Sly
|
|
|
###-#### C/C issued. 1/9/2003 2:00:23 PM
|
BLD-Framing/Rough-in | 11/8/2002 | 11/12/2002 | 11/12/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/08/2002 at 12:26:00. Contact: . Energy OK. 11/12/2002 9:32:17 AM
|
BLD-Framing/Rough-in | 11/5/2002 | 11/5/2002 | 11/5/2002 | P | FAIL |
Jim Sly
|
|
|
wayne; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie C/N on site. 11/5/2002 3:41:59 PM
|
BLD-Framing/Rough-in | 11/4/2002 | 11/4/2002 | 11/4/2002 | P | PART |
Jim Sly
|
|
|
shear; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung Shear nailing OK.....Need to inspect retro HDs at frame. Eng. on site. 11/4/2002 2:19:08 PM
|
BLD-Conference | 10/22/2002 | 10/22/2002 | 10/22/2002 | P | DONE |
Dave Hannah
|
|
|
WAYNE CONF FOR SHEAR PANEL; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 10/18/2002 | 10/18/2002 | 10/18/2002 | P | FAIL |
Jim Sly
|
|
|
sheer panel ###-#### wayne C/N 10/18/2002 4:50:39 PM
|
BLD-Foundation | 9/4/2002 | 9/5/2002 | 9/5/2002 | A | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Footing | 9/3/2002 | 9/4/2002 | 9/4/2002 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/03/2002 at 16:35:57. Contact: ###-####.
|