BLD-Final | 10/6/2003 | 10/10/2003 | 10/10/2003 | P | FAIL |
Jim Storey
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Barbara Moore no access. 10/10/2003 3:24:32 PM
|
BLD-Energy code compliance | 11/13/2002 | 11/13/2002 | 11/13/2002 | P | PART |
Carl Dependahl
|
|
|
walls ok
|
BLD-Wall cover | 11/12/2002 | 11/13/2002 | 11/13/2002 | A | PASS |
Carl Dependahl
|
|
|
out of time...insul ok, ok to cover pend all other trades. 11/13/02 3:00:33 PM
|
BLD-Wall cover | 11/12/2002 | 11/12/2002 | 11/12/2002 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/12/2002 at 08:17:58. Contact: ###-####.
|
BLD-Framing/Rough-in | 10/30/2002 | 10/30/2002 | 10/30/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/30/2002 at 10:57:36. Contact: ###-####.c/n made ok need to duct vent fan out of bldg. 10/30/2002 3:48:18 PM
|
BLD-Framing/Rough-in | 10/29/2002 | 10/29/2002 | 10/29/2002 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/29/2002 at 08:43:40. Contact: ###-####.c/n on site 10/29/2002 2:42:44 PM
|
BLD-Framing/Rough-in | 10/24/2002 | 10/24/2002 | 10/24/2002 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/24/2002 at 10:47:16. Contact: ###-####.no ele no stop. 10/24/2002 1:17:56 PM
|
BLD-Footing | 9/27/2002 | 9/30/2002 | 9/30/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/27/2002 at 17:56:14. Contact: ###-####. ft ok rebar thur out . 9/30/2002 9:53:48 AM
|