BLD-Final | 5/8/2003 | 5/9/2003 | 5/9/2003 | A | PASS |
Jim Storey
|
|
|
###-####
|
BLD-Final | 5/8/2003 | 5/8/2003 | 5/8/2003 | P | CANC |
Jim Storey
|
|
|
###-#### pj ###-#### pj per requist by phone call. 5/8/2003 1:35:42 PM
|
BLD-Energy code compliance | 11/1/2002 | 11/1/2002 | 11/1/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/01/2002 at 07:32:44. Contact: ###-####. all c/n items completed ok to cover 11/1/2002 1:09:37 PM
|
BLD-Framing/Rough-in | 10/30/2002 | 10/30/2002 | 10/30/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 10/30/2002 at 07:42:15. Contact: ###-####. C/N posted--ok to insulate 10/30/2002 3:09:41 PM
|
BLD-Framing/Rough-in | 10/28/2002 | 10/29/2002 | 10/29/2002 | A | PART |
Jim Sly
|
|
|
p j ; Phone #: ###-#### Internet Inspection Request from: Darla Downs Shear OK. 10/29/2002 9:05:08 AM
|
BLD-Framing/Rough-in | 10/21/2002 | 10/21/2002 | 10/21/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 10/21/2002 at 07:51:44. Contact: ###-####. shear wall C/N issued--shear ok but builder added pot out on master bath window--does not allow for 5' setback, remove or get variance form P. and Z. 10/21/2002 2:48:16 PM
|
BLD-Framing/Rough-in | 10/17/2002 | 10/18/2002 | 10/18/2002 | A | NR |
Tom Arcoraci
|
|
|
SHEER ###-#### PJ hd missing at fire place needs blocking at brace panels10/18/2002 9:57:41 AM 10/18/2002 9:58:05 AM
|
BLD-Framing/Rough-in | 10/18/2002 | 10/18/2002 | 10/18/2002 | P | FAIL |
Jim Storey
|
|
|
###-#### shear wall ###-#### shear c/n need plan and plan modifation back wall needs eningeering. 10/18/2002 4:31:50 PM
|
BLD-Foundation | 9/25/2002 | 9/25/2002 | 9/25/2002 | P | PART |
Steven Webb
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung wip 9/25/2002 2:24:41 PM
|
BLD-Footing | 9/23/2002 | 9/23/2002 | 9/23/2002 | P | PART |
Dave Hannah
|
|
|
JIM; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie work in progress 9/23/2002 2:34:02 PM
|