BLD-Final | 5/8/2003 | 5/8/2003 | 5/8/2003 | P | PASS |
Tom Arcoraci
|
|
|
TERRY; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Energy code compliance | 3/19/2003 | 3/20/2003 | 3/20/2003 | A | PASS |
Tom Arcoraci
|
|
|
###-####
|
BLD-Framing/Rough-in | 3/13/2003 | 3/13/2003 | 3/13/2003 | P | PASS |
Tom Arcoraci
|
|
|
###-####
|
BLD-Framing/Rough-in | 2/24/2003 | 2/24/2003 | 2/24/2003 | P | PASS |
Russ Owen
|
|
|
###-#### shear nail
|
BLD-Foundation | 10/30/2002 | 10/31/2002 | 10/31/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/30/2002 at 21:36:13. Contact: ###-####.
|
BLD-Footing | 10/30/2002 | 10/30/2002 | 10/30/2002 | P | PART |
Russ Owen
|
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie> Note set backs at left and right side can not be accurately determined , due to 5 min at each side. to meet the 5 foot set back the foundation wall will not be centerd on the footing. 10/30/2002 2:34:38 PM
|