BLD-Final | 11/12/2002 | 11/13/2002 | 11/13/2002 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/12/2002 at 10:29:07. Contact: ###-####.left over from yesterday. 11/12/2002 5:40:31 PM
|
BLD-Final | 11/12/2002 | 11/13/2002 | 11/13/2002 | A | CANC |
Tom Arcoraci
|
|
|
done by 407 11/13/2002 9:46:38 AM
|
BLD-Final | 11/12/2002 | 11/13/2002 | 11/13/2002 | A | PASS |
Russ Owen
|
|
|
|
BLD-Final | 11/1/2002 | 11/1/2002 | 11/1/2002 | A | FAIL |
Russ Owen
|
|
|
Stll needs smoke detectors in the left unit I am here with the contractor but we are unable to gain access into the left unit for verification. Told contractor to recall when access could be available. Contractor indicated problems with building owner existed bettween them. 11/1/2002 4:29:20 PM
|
BLD-Final | 10/30/2002 | 10/31/2002 | 10/31/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/30/2002 at 15:10:23. Contact: ###-####.needs smoke detectors. 10/31/2002 12:41:16 PM
|
BLD-Energy code compliance | 9/11/2002 | 9/12/2002 | 9/12/2002 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/11/2002 at 10:23:14. Contact: ###-####.c/n posted. 9/12/2002 3:06:20 PM
|
BLD-Energy code compliance | 9/12/2002 | 9/12/2002 | 9/12/2002 | P | PASS |
Jim Sly
|
|
|
framing corr. completed....Energy OK.
|
BLD-Framing/Rough-in | 9/11/2002 | 9/12/2002 | 9/12/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/11/2002 at 10:22:03. Contact: ###-####. Energy pass 9/12/2002 9:45:19 AM
|