BLD-Final | 1/17/2003 | 1/17/2003 | 1/17/2003 | P | PASS |
Dave Hannah
|
|
|
dwayne; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie c.c # 22624 issued 1/17/2003 1:27:13 PM
|
BLD-Framing/Rough-in | 11/6/2002 | 11/7/2002 | 11/7/2002 | A | PASS |
Dave Hannah
|
|
|
insulation also ok ok to cover 11/7/2002 10:21:09 AM
|
BLD-Framing/Rough-in | 11/5/2002 | 11/6/2002 | 11/6/2002 | A | PART |
Steven Webb
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie C/N issued--ok to insulate. 11/6/2002 9:43:32 AM
|
BLD-Framing/Rough-in | 11/6/2002 | 11/6/2002 | 11/6/2002 | P | CANC |
Tom Arcoraci
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung unable to respond by 5 pm 11/6/2002 5:09:15 PM
|
BLD-Framing/Rough-in | 11/5/2002 | 11/5/2002 | 11/5/2002 | P | FAIL |
Dave Hannah
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie no seal package or fire place r/i no inspection done at this time 11/5/2002 3:10:24 PM
|
BLD-Framing/Rough-in | 11/4/2002 | 11/4/2002 | 11/4/2002 | P | NR |
Dave Hannah
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie needes elec permit and r/i also needs fire place installed and inspected 11/4/2002 4:38:18 PM
|
BLD-Framing/Rough-in | 10/29/2002 | 10/30/2002 | 10/30/2002 | A | FAIL |
Dave Hannah
|
|
|
brian shear; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 10/30/2002 | 10/30/2002 | 10/30/2002 | P | PART |
Dave Hannah
|
|
|
shear ok to cover ext walls 10/30/2002 2:37:27 PM
|
BLD-Foundation | 10/10/2002 | 10/11/2002 | 10/11/2002 | A | DONE |
Jim Storey
|
|
|
placed with out insp. 10/11/2002 9:26:56 AM
|
BLD-Foundation | 10/10/2002 | 10/10/2002 | 10/10/2002 | P | CANC |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Amy Lawson out of time 10/10/2002 7:44:22 PM
|
BLD-Footing | 10/8/2002 | 10/8/2002 | 10/8/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/08/2002 at 10:07:58. Contact: ###-####.
|