BLD-Final | 1/10/2003 | 1/13/2003 | 1/13/2003 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/10/2003 at 13:44:44. Contact: ###-####.
|
BLD-Final | 12/12/2002 | 12/13/2002 | 12/13/2002 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/12/2002 at 10:03:07. Contact: ###-####.
|
BLD-Final | 12/13/2002 | 12/13/2002 | 12/13/2002 | P | FAIL |
Dave Hannah
|
|
|
elec didnt get finaled and contractor did wronge landing 12/13/2002 3:49:54 PM
|
BLD-Final | 11/20/2002 | 11/21/2002 | 11/21/2002 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/20/2002 at 07:47:30. Contact: ###-####.need ele sign off / fire stop ceilling / landing req. bacl door exterior. 11/21/2002 3:13:36 PM
|
BLD-Framing/Rough-in | 10/16/2002 | 10/16/2002 | 10/16/2002 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/16/2002 at 07:37:21. Contact: ###-####.exterior ok for cover. 10/16/2002 3:52:17 PM
|
BLD-Concrete | 10/3/2002 | 10/3/2002 | 10/3/2002 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/03/2002 at 08:36:14. Contact: ###-####.c/n posted 10/3/2002 2:59:30 PM
|