BLD-Final | 9/17/2003 | 9/18/2003 | 9/18/2003 | A | PASS |
Russ Owen
|
|
|
cameron; Phone #: ###-#### Internet Inspection Request from: Barbara Mooreok perm oc. 9/17/2003 6:55:36 PM
|
BLD-Final | 9/17/2003 | 9/18/2003 | 9/18/2003 | A | PASS |
Russ Owen
|
|
|
cameron; Phone #: ###-#### Internet Inspection Request from: Barbara Mooreok perm oc. 9/17/2003 6:55:36 PM
|
Permanent Occupancy | | 9/18/2003 | 9/18/2003 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 9/12/2003 | | PASS |
|
|
|
looks to be in compliance with dr.
|
BLD-Final | 9/4/2003 | 9/4/2003 | 9/4/2003 | P | PART |
Russ Owen
|
|
|
rick; Phone #: ###-#### Internet Inspection Request from: Darla Downsrick; Phone #: ###-#### Internet Inspection Request from: Darla Downscameron; Phone #: ###-#### Internet Inspection Request from: Annette Moore OK for a temp oc needes all required signatures on card for a PERM OC. 9/4/2003 12:32:15 AM
|
FIRE-Final Inspection | 9/4/2003 | 9/4/2003 | 9/4/2003 | P | PASS |
Troy Cobbley
|
|
|
fire life safety, fire alarm and fire sprinklers finaled
|
BLD-Final | 8/28/2003 | 9/2/2003 | 9/2/2003 | A | PART |
Russ Owen
|
|
|
cameron; Phone #: ###-#### Internet Inspection Request from: Barbara Moorecameron; Phone #: ###-#### Internet Inspection Request from: Barbara Moorecameron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Went for walk thru , needs all req signatures, and some corrections noted with contractor. 9/2/2003 11:34:58 PM
|
FIRE-Final Inspection | 8/29/2003 | 9/2/2003 | 9/2/2003 | A | FAIL |
Troy Cobbley
|
|
|
No items on the correction notice have been corrected 9/2/2003 10:39:34 AM
|
FIRE-Sprinkler Rough-in | 8/29/2003 | 9/2/2003 | 9/2/2003 | A | FAIL |
Troy Cobbley
|
|
|
No items on the correction notice have been corrected 9/2/2003 10:39:47 AM
|
FIRE-Final Inspection | 8/28/2003 | 8/29/2003 | 8/29/2003 | A | FAIL |
Troy Cobbley
|
|
|
repair emergency light in the north dining area, provide emergency light in the visiting area 8/29/2003 2:33:57 PM
|
FIRE-Final Inspection | 8/28/2003 | 8/29/2003 | 8/29/2003 | A | FAIL |
Troy Cobbley
|
|
|
repair emergency light in the north dining area, provide emergency light in the visiting area 8/29/2003 2:33:57 PM
|
Code Occupancy Approval Temp | 8/28/2003 | 8/27/2003 | 8/27/2003 | A | DONE |
Scott M.Brown
|
|
|
BOND IN PLACE FOR LANDSCAPE TEMP OCCUPANCY SIGNED OFF. 8/28/2003 9:54:57 AM
|
BLD-Framing/Rough-in | 6/17/2003 | 6/18/2003 | 6/18/2003 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 6/17/2003 at 6:55:05 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 5/29/2003 | 5/30/2003 | 5/30/2003 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/29/2003 at 6:45:01 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 5/28/2003 | 5/29/2003 | 5/29/2003 | A | PART |
Russ Owen
|
|
|
cameron; Phone #: ###-#### Internet Inspection Request from: Barbara MooreOk except for entry area will recall. 5/29/2003 12:50:43 PM
|
BLD-Framing/Rough-in | 5/28/2003 | 5/28/2003 | 5/28/2003 | P | NR |
Russ Owen
|
|
|
cameron; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 5/27/2003 | 5/27/2003 | 5/27/2003 | P | PART |
Tom Arcoraci
|
|
|
cameron; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to side phase 2 ok to insulate 5/27/2003 3:00:29 PM
|
BLD-Framing/Rough-in | 5/21/2003 | 5/22/2003 | 5/22/2003 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/21/2003 at 10:51:41 AM. Contact: ###-####.c/n in hallway ares ok to insulate. 5/27/2003 9:52:46 AM
|
BLD-Framing/Rough-in | 5/16/2003 | 5/19/2003 | 5/19/2003 | A | CANC |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 5/19/2003 | 5/19/2003 | 5/19/2003 | P | CANC |
Russ Owen
|
|
|
5:13:53 PMwrong one caled in. 5/19/2003 5:14:25 PM
|
BLD-Framing/Rough-in | 5/16/2003 | 5/16/2003 | 5/16/2003 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/16/2003 at 10:54:30 AM. Contact: ###-####.
|
BLD-Footing | 3/21/2003 | 3/24/2003 | 3/24/2003 | P | PART |
Russ Owen
|
|
|
BILL; Phone #: ###-#### Internet Inspection Request from: Darla Downs.Interior footing 3/24/2003 2:55:50 PM
|
BLD-Footing | 3/19/2003 | 3/20/2003 | 3/20/2003 | P | FAIL |
Russ Owen
|
|
|
BILL; Phone #: ###-#### Internet Inspection Request from: Darla Downsc/n conduit in footings posted. 3/20/2003 3:07:03 PM
|
BLD-Footing | 3/17/2003 | 3/17/2003 | 3/17/2003 | P | CANC |
Russ Owen
|
|
|
cameron; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Foundation | 2/20/2003 | 2/21/2003 | 2/21/2003 | P | PASS |
Russ Owen
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
FIRE-Conference | 2/20/2003 | 2/21/2003 | 2/21/2003 | A | DONE |
Troy Cobbley
|
|
|
cameron; Phone #: ###-#### Discussed fire dept. access to construction site 2/21/2003 9:26:15 AM
|
BLD-Foundation | 2/18/2003 | 2/19/2003 | 2/19/2003 | A | CANC |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung out of time 2/19/2003 10:27:55 AM
|
BLD-Foundation | 2/19/2003 | 2/19/2003 | 2/19/2003 | P | CANC |
Dave Hannah
|
|
|
this is the south section MTI did a sprc inspection on monday and signed off the footing 2/19/2003 5:41:15 PM
|
BLD-Footing | 2/14/2003 | 2/14/2003 | 2/14/2003 | P | NR |
Russ Owen
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Footing | 2/7/2003 | 2/10/2003 | 2/10/2003 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 2/7/2003 at 11:54:08 AM.
|