BLD-Final | 6/13/2003 | 6/16/2003 | 6/16/2003 | A | PASS |
Jim Storey
|
|
|
###-####
|
BLD-Final | 6/12/2003 | 6/13/2003 | 6/13/2003 | P | FAIL |
Alan Hauser
|
|
|
c/n posted 6/14/2003 1:15:55 AM
|
BLD-Energy code compliance | 3/7/2003 | 3/7/2003 | 3/7/2003 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 3/7/2003 | 3/7/2003 | 3/7/2003 | P | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Energy code compliance | 3/3/2003 | 3/4/2003 | 3/4/2003 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/3/2003 at 9:36:11 PM. Contact: ###-####.trusses top bracing/ web bracing/ mech on fire places/ ok to insulate. 3/4/2003 4:26:19 PM
|
BLD-Wall cover | 3/3/2003 | 3/4/2003 | 3/4/2003 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/3/2003 at 9:37:46 PM. Contact: ###-####. FRAIMING R/I
|
BLD-Framing/Rough-in | 12/18/2002 | 12/19/2002 | 12/19/2002 | A | NR |
Jim Storey
|
|
|
###-#### JUSTIN ###-#### JUSTIN insp can be done. 12/19/2002 10:31:38 AM
|
BLD-Framing/Rough-in | 12/3/2002 | 12/3/2002 | 12/3/2002 | P | PART |
Jim Sly
|
|
|
steven shear inspection; Phone #: ###-#### Internet Inspection Request from: Darla Downs Shear OK. 12/3/2002 2:04:43 PM
|
BLD-Framing/Rough-in | 12/2/2002 | 12/2/2002 | 12/2/2002 | P | NR |
Steven Webb
|
|
|
sheer ###-#### brad No approved plans on site--no shear inspection was performed--Conference per builders request--eng. from truss manufacture on trusses both sides of stairs to bonus room will be required for framing inspection. 12/2/2002 3:08:50 PM
|
BLD-Foundation | 10/24/2002 | 10/25/2002 | 10/25/2002 | A | PART |
Steven Webb
|
|
|
###-#### wip--10% ready. 10/25/2002 10:06:04 AM
|
BLD-Foundation | 10/23/2002 | 10/24/2002 | 10/24/2002 | P | CANC |
Jim Sly
|
|
|
ERIC ###-####
|
BLD-Footing | 10/22/2002 | 10/23/2002 | 10/23/2002 | P | PASS |
Steven Webb
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|