BLD-Final | 4/14/2003 | 4/14/2003 | 4/14/2003 | A | PASS |
Russ Owen
|
|
|
ok perm oc. 4/14/2003 1:25:43 PM
|
Permanent Occupancy | | 4/14/2003 | 4/14/2003 | | DONE |
|
|
|
|
BLD-Final | 4/11/2003 | 4/11/2003 | 4/11/2003 | P | PART |
Russ Owen
|
|
|
DAVE; Phone #: ###-#### Internet Inspection Request from: Darla DownsAll of the c/ns are complete except draft stoping top of wall in mec room , all signatures on card for perm oc except public works and achd, contractor said public works will sign card in office and he is taking card to achd. 4/11/2003 4:29:20 PM
|
Code Occupancy Approval | 4/10/2003 | 4/10/2003 | 4/10/2003 | P | PASS |
Scott M.Brown
|
|
|
ALL IN SO SIGNED FINAL OCCUPANCY 4/10/2003 4:30:27 PM
|
FIRE-Final Inspection | 4/9/2003 | 4/10/2003 | 4/10/2003 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 4/9/2003 at 5:45:48 PM. Contact: ###-####. need remote LED's for detectors located under floor; need address; main exit door hardware 4/10/2003 9:55:02 AM
|
FIRE-Final Inspection | 4/10/2003 | 4/10/2003 | 4/10/2003 | P | PASS |
Rick Jackson
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Conference | 4/7/2003 | 4/8/2003 | 4/8/2003 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 4/7/2003 at 4:35:42 PM. Contact: ###-####.Left a c/n ,partial inspection as this needs all reqd signatures. 4/8/2003 2:14:22 PM
|
BLD-Framing/Rough-in | 2/18/2003 | 2/18/2003 | 2/18/2003 | P | PASS |
Tom Arcoraci
|
|
|
ok from eng
|
BLD-Framing/Rough-in | 2/13/2003 | 2/14/2003 | 2/14/2003 | A | FAIL |
Russ Owen
|
|
|
DAVE; Phone #: ###-#### Internet Inspection Request from: Darla Downs. Spoke with engineer he will go back to verify corrections/ his and mine, have been completed waiting for a letter. Then would be ok for insulation. 2/14/2003 1:37:12 PM
|
BLD-Framing/Rough-in | 2/6/2003 | 2/7/2003 | 2/7/2003 | A | FAIL |
Russ Owen
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie posted a c/n. do not side do not insulate.2/7/2003 11:32:23 AM 2/7/2003 11:32:44 AM
|
BLD-Conference | 2/4/2003 | 2/4/2003 | 2/4/2003 | P | FAIL |
Russ Owen
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Marsha Smyliedid exterior shear c/n posted. 2/4/2003 4:41:30 PM
|
BLD-Foundation | 12/12/2002 | 12/13/2002 | 12/13/2002 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/12/2002 at 17:02:23. Contact: ###-####.
|
BLD-Footing | 12/11/2002 | 12/12/2002 | 12/12/2002 | P | PASS |
Russ Owen
|
|
|
###-####
|