BLD-Aging Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 | | PASS |
Jim Sly
|
|
|
|
BLD-Aging Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 | | PASS |
Jim Sly
|
|
|
|
BLD-Final | 3/17/2003 | 3/17/2003 | 3/17/2003 | P | PASS |
Jim Sly
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Annette Moore OK for Perm Occ. 3/17/2003 1:33:57 PM
|
BLD-Final | 2/13/2003 | 2/14/2003 | 2/14/2003 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/13/2003 at 12:44:57 PM. Contact: ###-####. OK for Temp Occ. C/N obtain Perm Occ status within 90 days of this notice. 2/14/2003 3:18:48 PM
|
FIRE-Final Inspection | 2/12/2003 | 2/13/2003 | 2/13/2003 | A | PASS |
Troy Cobbley
|
|
|
life safety finaled. I spoke with the contractor about ADA hardware to be provided for the pocket doors. Structural inspector will need to verify 2/13/2003 10:39:14 AM
|
BLD-Other | 2/5/2003 | 2/6/2003 | 2/6/2003 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/05/2003 at 13:53:46. Contact: ###-####. Grid ceiling. 2/6/2003 2:47:32 PM
|
BLD-Wall cover | 1/17/2003 | 1/17/2003 | 1/17/2003 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/17/2003 at 10:02:23. Contact: ###-####.
|
BLD-Framing/Rough-in | 1/8/2003 | 1/9/2003 | 1/9/2003 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/08/2003 at 11:54:15. Contact: ###-####.
|
Permanent Occupancy | | 3/17/2002 | 3/17/2002 | | DONE |
|
|
|
|