Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD02-02581
StatusExpired
Name INTERMTN HOSPITAL PSYCHIATRIC CARE CENTER
Site Address 303 N ALLUMBAUGH ST
Project NameINTERMOUNTAIN HOSPITAL
Customer Number 
ePlanReviewNo
Description
(INTERMOUNTAIN HOSPITAL) To remove the suspended grid ceiling system in (7)seven existing patient rooms. To reinstall suspended steel framing and attached gypsum panel products per Architects details, ER-1994 and 2000 IBC. NOTE: This building is fully sprinklered for allowable area increase and occupancy use. A final approval and issuance of a "letter of completion / compliance" is required as a condition of this permit. PC#02-680/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection1/12/20041/12/20041/12/2004 PASS
DetailsTom Arcoraci
BLD-Final1/16/20031/16/20031/16/2003PPASS
DetailsTom Arcoraci
###-#### ok for perm occ 1/16/2003 3:09:16 PM
FIRE-Final Inspection1/15/20031/16/20031/16/2003APASS
DetailsTroy Cobbley
fire sprinkler and life safety finaled 1/16/2003 9:32:53 AM
FIRE-Conference1/14/20031/14/20031/14/2003PDONE
DetailsTroy Cobbley
I spoke with the contractor about using only sprinkler canopies with sprinkler heads that have been listed together and adjusting the sprinkler pendants that are hanging below the ceiling. 1/14/2003 2:09:55 PM
BLD-Final1/9/20031/10/20031/10/2003PNR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 01/09/2003 at 17:33:02. Contact: ###-####. needs fire 1/10/2003 2:53:02 PM
FIRE-Final Inspection1/9/20031/10/20031/10/2003AFAIL
DetailsTroy Cobbley
replace the missing sprinkler canopies and adjust the sprinkler pendants that are hanging below the ceiling 1/10/2003 11:26:05 AM
BLD-Final1/8/20031/9/20031/9/2003ANR
DetailsTom Arcoraci
MIKE; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in12/18/200212/19/200212/19/2002APART
DetailsTom Arcoraci
###-####
BLD-Framing/Rough-in12/6/200212/9/200212/9/2002APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/06/2002 at 16:39:52. Contact: ###-####. wip ok 12/9/2002 10:44:16 AM
BLD-Framing/Rough-in12/5/200212/6/200212/6/2002PPART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 12/05/2002 at 17:36:47. Contact: ###-####. Room 44--Need to verify tie off wires for this room on lights/supply air at next room inspection. 12/6/2002 3:24:46 PM
BLD-Framing/Rough-in11/21/200211/22/200211/22/2002APART
DetailsRuss Owen
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie1 room ceiling. 11/22/2002 11:45:50 AM
BLD-Framing/Rough-in11/21/200211/21/200211/21/2002PPART
DetailsTom Arcoraci
###-#### 1st room ok 11/21/2002 2:00:30 PM
BLD-Framing/Rough-in11/21/200211/21/200211/21/2002PCANC
DetailsTom Arcoraci
###-####