BLD-Final | 1/31/2003 | 1/31/2003 | 1/31/2003 | A | PASS |
Jim Storey
|
|
|
final ok 1/31/2003 9:49:26 AM
|
BLD-Energy code compliance | 12/4/2002 | 12/5/2002 | 12/5/2002 | A | PASS |
Jim Storey
|
|
|
frank; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 12/3/2002 | 12/4/2002 | 12/4/2002 | P | PASS |
Jim Storey
|
|
|
FRANK ; Phone #: ###-#### Internet Inspection Request from: Darla Downsstraps and engineers redesign ok for insulation. 12/4/2002 4:26:45 PM
|
BLD-Framing/Rough-in | 11/29/2002 | 12/2/2002 | 12/2/2002 | P | FAIL |
Jim Storey
|
|
|
###-#### call first for access c/n need hvac and fire place/ engineering for laderal design and colum design / strap 2 nd floor bearing walls/ 2 member post under mlbeam to ft, 12/2/2002 2:27:31 PM
|
BLD-Foundation | 11/7/2002 | 11/7/2002 | 11/7/2002 | A | DONE |
Jim Storey
|
|
|
###-#### ###-#### I was in class on this day others responsable to do insp. 11/12/2002 8:06:29 AM
|
BLD-Footing | 11/4/2002 | 11/5/2002 | 11/5/2002 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/04/2002 at 17:55:45. Contact: ###-####. exterior ft only interior ft pads not inspected at this time. 11/5/2002 9:42:18 AM
|