Permit Information
Permit NumberBLD02-02618
StatusFinaled
Name BOISE OFFICE EQUIPMENT
Site Address 330 N ANCESTOR PL Unit: 107
Project NameBOISE OFFICE EQUIPMENT
Customer Number 
ePlanReviewNo
Description
(BOISE OFFICE EQUIPMENT)(SUITE #107) New 5,183 sq.ft. warehouse/office tenant space in existing building per approved plans on file. This tenant will be in an area formerly occupied by the adjacent tenant in Suite #108. This work being done in conjunction with the adjacent tenant work under BLD02-02619. Work to include a new one-hour rated tenant demising wall, a new accessible restroom, a few new interior walls, three new interior doors, interior finish, fire sprinkler work, mechanical work, plumbing work, and electrical work. No racking exceeding 8 ft. in height is allowed under this permit. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is fully fire sprinklered for area increase. (PC#0688-02) JCB
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection11/17/200611/17/200611/21/2006 DONE
DetailsMike Jordan
DOC - Permit Finaled11/21/200611/21/200611/21/2006ADONE
DetailsMike Jordan
All trades have been finaled.
FIRE-Final Inspection9/11/20069/11/20069/11/2006PPASS
DetailsTroy Cobbley
Life safety finaled
BLD-Aging Inspection8/23/20068/23/20068/23/2006 NR
DetailsMike Jordan
pending sprinkler work.
BLD-Aging Inspection6/12/20066/12/20066/13/2006 PEND
DetailsMike Jordan
waiting on life/safety issues.
BLD-Aging Inspection3/29/20063/29/20064/3/2006 NR
DetailsTroy Cobbley
Correction notice was given to office manager. Notice stated that the fire sprinkler work shall be done as per the original correction notice. Work is to be started by 4/10/06.
BLD-Conference12/12/200312/12/200312/12/2003ACANC
DetailsRuss Owen
I called the number listed and left a message to call me back , about this permit. 12/12/2003 10:51:41 AM
BLD-Final2/27/20032/28/20032/28/2003PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 2/27/2003 at 2:30:55 PM. Contact: ###-####.
FIRE-Final Inspection2/27/20032/28/20032/28/2003AFAIL
DetailsTroy Cobbley
the tenant is storing broken fax and copy machines in the front area. the sprinkler pendants are over space for ordinary hazard occupancy. Sprinkler plans will need to be submitted 2/28/2003 2:02:03 PM
BLD-Final2/18/20032/19/20032/19/2003PNR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 2/18/2003 at 11:57:00 AM. Contact: ###-####. no fire insp 2/19/2003 1:32:33 PM
FIRE-Final Inspection2/18/20032/19/20032/19/2003ACANC
DetailsTroy Cobbley
contractor called and stated that he wasn't ready yet 2/19/2003 12:36:17 PM
FIRE-Final Inspection12/18/200212/19/200212/19/2002AFAIL
DetailsTroy Cobbley
one sprinkler head has been added in the restroom per the general contractor. The fire dept. review note #1 requires a permit for this work. He stated Shilo Automatic sprinkler installed the pendant. Repair bulb in the exit sign at the main exit, provide new exit sign per the plans at the ware house door, provide the main building address as well as the tenant address 12/19/2002 11:09:25 AM
BLD-Final12/16/200212/17/200212/17/2002AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/16/2002 at 15:45:19. Contact: .Needs fire life/safety and rest room door clearance. c/n 12/17/2002 11:11:28 AM
BLD-Framing/Rough-in12/3/200212/3/200212/3/2002PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/03/2002 at 10:10:38. Contact: ###-####. rest room ok. 12/3/2002 2:47:32 PM
BLD-Wall cover12/3/200212/3/200212/3/2002PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/03/2002 at 10:11:22. Contact: ###-####.
BLD-Framing/Rough-in11/18/200211/18/200211/18/2002PPART
DetailsRuss Owen
###-#### TONY. ok subject to ele and plm inspections, contractor on site notified. 11/18/2002 4:14:55 PM 11/18/2002 4:15:14 PM
FIRE-Conference4/3/20064/10/2006 P 
DetailsTroy Cobbley
Follow-up on correction notice. One week was given to start work ending on 4/10/06.