Permanent Occupancy | | 12/12/2002 | 12/12/2002 | | DONE |
|
|
|
|
BLD-Final | 11/22/2002 | 11/25/2002 | 11/25/2002 | A | PASS |
Jim Storey
|
|
|
perm occ ok pending plm temp / ele n/a. 11/25/2002 8:51:34 AM
|
BLD-Final | 11/21/2002 | 11/22/2002 | 11/22/2002 | P | FAIL |
Jim Storey
|
|
|
FN TIM-###-####---RE-INSP out of time 11/22/2002 6:04:25 PM
|
FIRE-Final Inspection | 11/21/2002 | 11/22/2002 | 11/22/2002 | A | PASS |
Troy Cobbley
|
|
|
life/safety finaled. The door hardware for the restrooms was being installed during the inspection and appears to be correct 11/22/2002 11:33:18 AM
|
BLD-Final | 11/20/2002 | 11/21/2002 | 11/21/2002 | A | NR |
Tom Arcoraci
|
|
|
###-#### no fire inspection 11/21/2002 10:14:35 AM
|
FIRE-Final Inspection | 11/21/2002 | 11/21/2002 | 11/21/2002 | P | FAIL |
Troy Cobbley
|
|
|
remove the thumbturn on the main exit, provide approved door hardware on the restroom doors 11/21/2002 2:28:36 PM
|
FIRE-Final Inspection | 11/21/2002 | 11/21/2002 | 11/21/2002 | P | FAIL |
Troy Cobbley
|
|
|
remove the thumbturn on the main exit, provide approved door hardware on the restroom doors 11/21/2002 2:28:36 PM
|