BLD-Final | 10/20/2003 | 10/28/2003 | 10/28/2003 | A | PASS |
Dave Hannah
|
|
|
renee -###-####
|
BLD-Conference | 2/24/2003 | 2/27/2003 | 2/27/2003 | P | PASS |
Carl Dependahl
|
|
|
for conf- hanley- ###-####...need landing at floor if door swings over 2/27/2003 3:43:37 PM
|
BLD-Foundation | 12/11/2002 | 12/12/2002 | 12/12/2002 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/11/2002 at 14:16:24. Contact: ###-####....backfilled w drain rock , for drainage at stair well. 12/12/2002 12:28:26 PM
|
BLD-Foundation | 12/9/2002 | 12/10/2002 | 12/10/2002 | A | PART |
Carl Dependahl
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung, walls formed ok, need drain(s) per eng'g, req's insp prior to backfill. 12/10/2002 11:15:32 AM
|
BLD-Foundation | 12/6/2002 | 12/9/2002 | 12/9/2002 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/06/2002 at 10:41:32. Contact: ###-####.no one on site nothing ready for insp. 12/9/2002 10:16:59 AM
|
BLD-Footing | 12/5/2002 | 12/6/2002 | 12/6/2002 | A | PART |
Carl Dependahl
|
|
|
AUDIE ###-####, eng'd stairwell ftg. 12/6/2002 8:55:19 AM
|
BLD-Footing | 12/5/2002 | 12/6/2002 | 12/6/2002 | A | PART |
Carl Dependahl
|
|
|
AUDIE ###-####, eng'd stairwell ftg. 12/6/2002 8:55:19 AM
|
BLD-Footing | 12/4/2002 | 12/5/2002 | 12/5/2002 | P | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/04/2002 at 12:23:18. Contact: ###-####. GAY CALLED TO CANC THIS INSPECTION IT IS NOT READY YET
|
BLD-Foundation | 11/20/2002 | 11/20/2002 | 11/20/2002 | P | PART |
Carl Dependahl
|
|
|
###-#### frank--paperwrok -- in shed in back yard, walls below hse only , has eng'd stair well later. 11/20/02 3:15:17 PM
|
BLD-Footing | 11/14/2002 | 11/15/2002 | 11/15/2002 | P | PART |
Tony Young
|
|
|
MARK- ###-####
wip 11/15/2002 12:55:24 PM
|