Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD02-02719
StatusFinaled
Name PENTALON CONSTRUCTION, INC.
Site Address 8521 W FAIRVIEW
Project NameASPEN SPRINGS APARTMENTS
Customer Number 
ePlanReviewNo
Description
Building 2 Type B Section 2) * A two hour area separation wall will be constructed to divide this building into two separate buildings. * To construct a new 10,132 sq.ft. two story with a basement, 12 unit apartment building. The basement is approximately 3,516 sq.ft. and the first and second floor are approximately 3,308 sq.ft each. All construction is per the approved plans and attached comment list. Work to include on site landscaping and parking lot. Refer to BLD 02-01069 for other side of area separation wall. MJPDRH02-00005 CUP01-00164 PC#282-02
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/2/200312/2/200312/2/2003 DONE
final ok for perm. occ./Jim
Permanent Occupancy 12/2/200312/2/2003 DONE
Details
FIRE-Final Inspection11/26/200311/26/200311/26/2003PPASS
DetailsTroy Cobbley
fire alarm and fire life safety is ok
BLD-Final10/16/200310/16/200310/16/2003PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/16/2003 at 9:25:07 AM. Contact: ###-####. 10/16/2003 1:32:57 PM C/N....Need Fire Perm Occ only.....OK for struct final after that. OK for Temp.
10/16/2003 1:34:03 PM 10/16/2003 1:34:34 PM 10/16/2003 1:39:29 PM
BLD-Final10/13/200310/13/200310/13/2003PNR
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/13/2003 at 9:30:14 AM. Contact: ###-####.
FIRE-Final Inspection10/10/200310/10/200310/10/2003PPART
DetailsTroy Cobbley
Temp occupancy given until the NAC panel for the fire alarm system can be replaced
FIRE-Final Inspection10/8/200310/8/200310/8/2003PFAIL
DetailsTroy Cobbley
Life safety is ok but need to final fire alarm 10/8/2003 3:34:53 PM
FIRE-Final Inspection10/6/200310/6/200310/6/2003PFAIL
DetailsTroy Cobbley
no fire extinguishers installed, door hinges not adjusted, smoke detectors not tested 10/6/2003 3:28:13 PM
Code Occupancy Approval10/1/20039/30/20039/30/2003APASS
DetailsWm. Michael Meloy
Compliance met. 10/1/2003 11:58:58 AM
BLD-Framing/Rough-in8/4/20038/4/20038/4/2003PPART
DetailsRuss Owen
gyp crete ok. 8/6/2003 12:50:02 PM
BLD-Conference7/11/20037/11/20037/11/2003PPASS
DetailsRuss Owen
k to drywall. 7/11/2003 3:44:47 PM
BLD-Energy code compliance7/10/20037/10/20037/10/2003PPART
DetailsRuss Owen
VINCENT ###-#### Posetd c/ for fire wall continuity plans lack adequate detailing and I have went over areas with contractor trhat I have now found. Note: most problems on this job are due to inadequate plans. 7/10/2003 6:02:23 PM
BLD-Framing/Rough-in7/8/20037/8/20037/8/2003PPART
DetailsRuss Owen
7/9/2003 12:12:58 PM Ok to insulate only prior c/n needs to be addressed which is on site in trailer. 7/9/2003 12:13:36 P 7/9/2003 12:12:58 PM Ok to insulate only prior c/n needs to be addressed which is on site in trailer.M 7/9/2003 12:13:42 PM
BLD-Framing/Rough-in7/3/20037/7/20037/7/2003PFAIL
DetailsRuss Owen
###-#### vincent, same c/n items to correct. 7/7/2003 6:09:37 PM###-#### vincent, same c/n items to correct. 7/7/2003 6:09:44 PM
BLD-Framing/Rough-in7/3/20037/3/20037/3/2003PFAIL
DetailsRuss Owen
###-#### vincent, fire stoping shear nailing needs to be completed. 7/7/2003 11:44:51 AM
BLD-Framing/Rough-in7/2/20037/2/20037/2/2003PFAIL
DetailsRuss Owen
7/2/2003 5:44:29 PM, went over areas with contractor marked with paint. 7/2/2003 5:45:47 PM
BLD-Framing/Rough-in7/1/20037/1/20037/1/2003APART
DetailsRuss Owen
partial not complete,went over flue pipes thru floor, and other fire stoping and framing. 7/1/2003 5:23:20 PM 7/1/2003 5:23:53 PM
BLD-Conference6/30/20036/30/20037/1/2003PPASS
DetailsCarl Dependahl
w/ vince...will notify if meeting requested. 7/1/2003 10:35:53 AM
BLD-Framing/Rough-in6/27/20036/30/20036/30/2003PCANC
DetailsRuss Owen
###-#### vincent . ou###-#### vincent . oit of time due to brt of time due to bomb threat at city hall.7/1/2003 11:38:58 AM omp 7/1/2003 11:39:01 AM 7/1/2003 11:39:24 AM
BLD-Framing/Rough-in6/26/20036/27/20036/27/2003ANR
DetailsRuss Owen
###-#### vincent
BLD-Framing/Rough-in6/27/20036/27/20036/27/2003PFAIL
DetailsRuss Owen
went over c/n items. 6/27/2003 5:19:14 PM
BLD-Framing/Rough-in6/24/20036/25/20036/25/2003PNR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 6/24/2003 at 6:01:45 PM. Contact: ###-####.this needs addnl work completed went over some items with contractor. 6/25/2003 5:21:10 PMScheduled by a contractor via Hello! on 6/24/2003 at 6:01:45 PM. Contact: ###-####.this needs addnl work completed went over some items with contractor. 6/25/2003 5:21:17 PM
BLD-Framing/Rough-in5/19/20035/19/20035/19/2003PPASS
DetailsRuss Owen
bob shear; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Note the engineer has reviewed the architects detail and has eliminated some home downs that were showns. Note there is still a problem with the exterior wall as the listing is for western 1 coat , and they want to put a synthetic rock under. c/n are posted for this at all buildings. 5/19/2003 5:10:29 PM
BLD-Framing/Rough-in5/7/20035/8/20035/8/2003AFAIL
DetailsRuss Owen
vincent; Phone #: ###-#### Internet Inspection Request from: Annette MooreAgain engineering is not ledgible as architect has shown hold downs which are not needed and some in the wrong locations etc same probles as the rest of the buildings. Note Engineer has reveived architects drawing and has eliminated some hold downs. Went over this with contractor. 5/8/2003 4:50:10 PM
BLD-Conference3/19/20033/20/20033/20/2003ACANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 3/19/2003 at 4:32:17 PM. Contact: ###-####.
BLD-Conference3/20/20033/20/20033/20/2003PPART
DetailsRuss Owen
went over construction of 5 1hr items. 3/20/2003 1:58:48 PM
BLD-Conference3/13/20033/14/20033/14/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 3/13/2003 at 5:42:09 PM. Contact: ###-####. went over tub enclosures and other misc items for v1hr const.. 3/14/2003 11:04:45 AM d 3/14/2003 11:04:48 AM 3/14/2003 11:05:32 AM
BLD-Foundation1/31/20032/3/20032/3/2003APASS
DetailsRuss Owen
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD-Footing1/28/20031/29/20031/29/2003PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 01/28/2003 at 13:17:24. Contact: ###-####.
BLD-Footing1/23/20031/27/20031/27/2003PNR
DetailsRuss Owen
vincent; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie rained out. 1/27/2003 4:05:12 PM