BLD-Final | 8/13/2003 | 8/13/2003 | 8/13/2003 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/13/2003 at 8:13:15 AM. Contact: ###-####. C.C # 23944 ISSUED 8/13/2003 3:42:04 PM
|
BLD-Grading Inspection | 8/12/2003 | 8/12/2003 | 8/12/2003 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage complete and approved
|
BLD-Energy code compliance | 4/17/2003 | 4/18/2003 | 4/18/2003 | A | PASS |
Dave Hannah
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to cover 4/18/2003 9:26:22 AM
|
BLD-Energy code compliance | 4/16/2003 | 4/17/2003 | 4/17/2003 | A | NR |
Dave Hannah
|
|
|
JIM ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 4/17/2003 | 4/17/2003 | 4/17/2003 | A | PASS |
Dave Hannah
|
|
|
all c/n items have been completed
|
BLD-Conference | 3/28/2003 | 3/28/2003 | 3/28/2003 | P | PASS |
Carl Dependahl
|
|
|
ok to insul only
|
BLD-Conference | 3/27/2003 | 3/28/2003 | 3/28/2003 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 3/27/2003 at 4:56:07 PM. Contact: ###-####....ok to side, nailing, straps ok, call for frame insp. 3/28/2003 1:40:13 PM
|
BLD-Framing/Rough-in | 3/28/2003 | 3/28/2003 | 3/28/2003 | P | FAIL |
Tom Arcoraci
|
|
|
c/n, nail roof b 3/28/2003 1:33:48 PMlocks per eng'r; need eng's design for revision to front...clerestory windows added, verify flat roof, slope w/o membrane? chk manuf's spec.3/28/2003 1:36:04 PM 3/28/2003 1:37:51 PM
|
BLD-Framing/Rough-in | 3/24/2003 | 3/24/2003 | 3/24/2003 | P | NR |
Carl Dependahl
|
|
|
SHEAR--SEE GEORGE...keep c/n, need plans 3/24/2003 4:36:14 PM
|
BLD-Framing/Rough-in | 3/20/2003 | 3/21/2003 | 3/21/2003 | P | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 3/20/2003 at 1:00:10 PM. Contact: ###-####. Shear--Portion of house already sided--almost entire house covered with house wrap--removed misc. & inspected--not per approved plans--issued c/n --remove wrap covering brace panels, fasten per plans and re-call for inspection prior to covering exterior. 3/21/2003 1:47:34 PM
|
BLD-Foundation | 1/9/2003 | 1/10/2003 | 1/10/2003 | A | PART |
Carl Dependahl
|
|
|
robert; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie FND WALL AT GARAGE & SIDE OF HOUSE. 1/9/2003 5:03:29 PM
|
BLD-Footing | 1/6/2003 | 1/7/2003 | 1/7/2003 | P | PART |
Carl Dependahl
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...garage, ext stair, isolated ftg's ok...drains & waterproofing installed at front. 1/7/2003 2:32:51 PM
|
BLD-Foundation | 12/17/2002 | 12/18/2002 | 12/18/2002 | A | PART |
Steven Webb
|
|
|
ROBERT; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie wip--85% ready at time of inspection--rebar installed per plans. 12/18/2002 9:19:37 AM
|
BLD-Footing | 12/11/2002 | 12/12/2002 | 12/12/2002 | A | PART |
Carl Dependahl
|
|
|
robert; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ...eng's letter re site rec'd; ftgs ok; notified bldr to install drains per plans. 12/12/2002 12:58:51 PM
|
BLD-Grading Inspection | 12/12/2002 | 12/12/2002 | 12/12/2002 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade has been approved by the geotechnical engineer
|