BLD-Final | 1/3/2003 | 1/3/2003 | 1/3/2003 | P | PASS |
Jim Storey
|
|
|
###-####
|
BLD-Energy code compliance | 12/3/2002 | 12/4/2002 | 12/4/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/03/2002 at 15:39:33. Contact: ###-####.gas pipe protection in place. ok to cover. 12/4/2002 3:58:01 PM
|
BLD-Framing/Rough-in | 11/25/2002 | 11/25/2002 | 11/25/2002 | P | NR |
Jim Storey
|
|
|
###-#### ###-#### no roof framing yet. 11/25/2002 3:12:42 PM
|
BLD-Framing/Rough-in | 11/25/2002 | 11/25/2002 | 11/25/2002 | P | PASS |
Jim Storey
|
|
|
sheer ###-#### ed exterior ok for cover 11/25/2002 3:12:13 PM
|
BLD-Foundation | 11/13/2002 | 11/15/2002 | 11/15/2002 | A | PASS |
Jim Storey
|
|
|
###-#### bob
|
BLD-Footing | 11/12/2002 | 11/13/2002 | 11/13/2002 | A | NH |
Carl Dependahl
|
|
|
out of time...Called, unable to contact. 11/13/02 10:51:20 AM
|
BLD-Footing | 11/12/2002 | 11/12/2002 | 11/12/2002 | P | CANC |
Jim Storey
|
|
|
###-####
|